Locust Grove-Paytes substation interconnection queue

2 active projects totalling 40.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
40.3active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-010 Locust Grove-Paytes 115 kV 115 33 Battery Withdrawn
AC1-076 Pine Glade Solar 115 23.8 Solar In Service
AE2-134 Pine Glade Solar 115 16.5 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.