Locust Grove-Paytes substation interconnection queue
2 active projects totalling 40.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).
2active projects
40.3active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-010 | Locust Grove-Paytes 115 kV | 115 | 33 | Battery | Withdrawn |
| AC1-076 | Pine Glade Solar | 115 | 23.8 | Solar | In Service |
| AE2-134 | Pine Glade Solar | 115 | 16.5 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.