Somerset, NJ interconnection queue

3 active projects totalling 31.4 MW in the PJM queue, plus 11 with terminal status (shown greyed).

3active projects
31.4active MW
14total filed
Queue IDProjectkVMWResourceStatus
AA2-142 Branchburg-Deans 500kV 500 1,278 Gas Withdrawn
AB1-148 Branchburg-Deans 500kV 500 235 Gas Withdrawn
W1-063 Branchburg-Elroy 500kV 500 33 Not reported Withdrawn
C01-2102 Bridgewater 69 kV 69 30 Battery Active
AG2-256 Not reported n/r 8 Solar Withdrawn
X2-002 Somerville 13kV 13 4.3 Solar Withdrawn
AI1-033 Somerville 26 kV 26 3.8 Solar Withdrawn
C05 Somerset 34.5kV 34.5 3.8 Gas Withdrawn
X1-095 Bernards Township Solar Farm 12 1.1 Solar In Service
W2-036 Central SP 13 0.3 Solar In Service
AB1-099 Sunnymeade Road 13kV 13 0 Battery Withdrawn
AC1-197 Somerset 480v n/r 0 Gas Withdrawn
AD2-025 Hillsborough Storage 13 0 Battery Withdrawn
X2-035 Valley Road Solar 13 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.