Marsh Run substation interconnection queue

1 active project totalling 59.3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
59.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1238 Marsh Run 230 kV 230 59.3 Gas Active
AH1-228 Marsh Run 230kV 230 18 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.