Remington CT substation interconnection queue
6 active projects totalling 186.7 MW in the PJM queue, plus 4 with terminal status (shown greyed).
6active projects
186.7active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| W1-074 | Remington CT 230kV | 230 | 498 | Gas | Withdrawn |
| AH1-220 | Remington BESS | 230 | 60 | Battery | EP |
| AG1-152 | Remington BESS | 230 | 40 | Battery | Engineering and Procurement |
| AH1-685 | Remington CT 230 kV | 230 | 26 | Gas | Active |
| AH1-684 | Remington CT 230 kV | 230 | 23 | Gas | Active |
| AH1-693 | Remington CT 230 kV | 230 | 20 | Gas | Active |
| AI2-287 | Remington CT 230 kV | 230 | 18.3 | Gas | Withdrawn |
| AE2-132 | Remington GT3 | 230 | 17.7 | Gas | In Service |
| AI2-288 | Remington CT 230 kV | 230 | 16.9 | Gas | Withdrawn |
| AI2-289 | Remington CT 230 kV | 230 | 16.3 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.