Remington CT substation interconnection queue

6 active projects totalling 186.7 MW in the PJM queue, plus 4 with terminal status (shown greyed).

6active projects
186.7active MW
10total filed
Queue IDProjectkVMWResourceStatus
W1-074 Remington CT 230kV 230 498 Gas Withdrawn
AH1-220 Remington BESS 230 60 Battery EP
AG1-152 Remington BESS 230 40 Battery Engineering and Procurement
AH1-685 Remington CT 230 kV 230 26 Gas Active
AH1-684 Remington CT 230 kV 230 23 Gas Active
AH1-693 Remington CT 230 kV 230 20 Gas Active
AI2-287 Remington CT 230 kV 230 18.3 Gas Withdrawn
AE2-132 Remington GT3 230 17.7 Gas In Service
AI2-288 Remington CT 230 kV 230 16.9 Gas Withdrawn
AI2-289 Remington CT 230 kV 230 16.3 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.