Morrisville 230 kV
PJM queue ID C01-1376
Morrisville 230 kV (C01-1376) is listed in the PJM interconnection queue as a 400 MW battery project in Fauquier County, VA. The filing names Morrisville as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 1, 2031.
| Queue ID | C01-1376 |
|---|---|
| Project name | Morrisville 230 kV |
| Status (as published) | Active |
| Substation | Morrisville |
| Point of interconnection | Morrisville 230 kV |
| County | Fauquier |
| State | VA |
| Voltage | 230 kV |
| Capacity | 400 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2031-08-01 |
| Source dataset | cycle |
Same substation and county
Morrisville substation: 12 requests in the PJM queue, 1 active totaling 400 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| R77 | Morrisville 500kV | 600 | Gas | Withdrawn |
| S52 | Morrisville 500kV | 600 | Gas | Withdrawn |
| AD2-190 | Morrisville 230 kV | 111.8 | Solar | Withdrawn |
| AE1-022 | Morrisville 230 kV | 111.8 | Solar | Withdrawn |
| AE1-044 | Fitch Solar | 111.8 | Solar | Withdrawn |
| AH1-086 | Summersweet Energy Center, LLC | 90 | Battery | Withdrawn |
| AD2-032 | Morrisville 230 kV | 83.8 | Solar | Withdrawn |
| AG2-644 | Morrisville 230 kV | 80 | Battery | Withdrawn |
| AH1-087 | Summersweet Energy Center, LLC | 20 | Battery | Withdrawn |
| AH1-088 | Summersweet Energy Center, LLC | 20 | Battery | Withdrawn |
| AH1-089 | Summersweet Energy Center, LLC | 20 | Battery | Withdrawn |
Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.
A substation with the same name is named in PJM transmission planning materials: Morrisville (DOM, 10 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | ACE Development Company, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 400.0 |
| MW capacity | 400.0 |
| MFO | 400.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/9/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.