Warren County substation interconnection queue
3 active projects totalling 25 MW in the PJM queue, plus 1 with terminal status (shown greyed).
3active projects
25active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC2-133 | Warren County Power Station | 500 | 20 | Gas | In Service |
| AI2-020 | Warren County 500 kV | 500 | 11 | Gas | Withdrawn |
| C01-1242 | Warren County 500 kV | 500 | 5 | Gas | Active |
| AE2-184 | Warren County Power Station | 500 | 0 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.