Elk Run D.P.-Gainesville substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Elk Run D.P.-Gainesville as the point of interconnection, all in Fauquier County, VA.
Target commercial operation date as filed: Dec 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-190 | Alameda Solar | 230 | 27 | Solar | Withdrawn | Dec 2027 |
| AG1-031 | Alameda Solar | 230 | 8.4 | Solar | Withdrawn | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Fauquier County, VA
- Bristers: 1 active, 1,000 MW of 3 filed
- Remington CT - Elk Run: 2 active, 500 MW of 2 filed
- Morrisville: 1 active, 400 MW of 12 filed
- Remington: 6 active, 317.6 MW of 9 filed
- Remington CT: 6 active, 186.7 MW of 10 filed
- Harmony Village-Shackleford: 9 active, 146.6 MW of 11 filed
- Marsh Run: 1 active, 59.3 MW of 2 filed
- Sowego: none active of 3 filed
- Bristers-Ox: none active of 2 filed