Substation Scout

Bristers-Ox substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
S120 Bristers-Ox 500kV 500 0 Not reported Withdrawn
X3-065 Bristers-Ox 500kV 500 0 Not reported Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.