Bristers substation interconnection queue
1 active project totalling 1,000 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
1,000active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1884 | Bristers 500 kV | 500 | 1,000 | Battery | Active |
| AI1-032 | Bristers 115kV | 115 | 200 | Battery | Withdrawn |
| AG2-305 | Bristers 230 kV | 230 | 100 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.