Substation Scout

Bristers substation interconnection queue

1 active project totalling 1,000 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
1,000active MW
3total filed
Queue IDProjectkVMWResourceStatus
C01-1884 Bristers 500 kV 500 1,000 Battery Active
AI1-032 Bristers 115kV 115 200 Battery Withdrawn
AG2-305 Bristers 230 kV 230 100 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.