Warren substation interconnection queue

2 active projects totaling 62 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from May 2005 to Jun 2024 (5 filings).

2active projects
62active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
G00_W40 Warren 138 kV 138 264 Gas Withdrawn May 2005
G40 Warren 230kV 230 260 Gas Withdrawn n/r
S103 Warren Generating Station 115 57 Gas In Service Apr 2011
AF1-103 Warren 34.5 kV 34.5 20 Hybrid Withdrawn Jun 2023
AG1-481 Warren 34.5 kV 34.5 15.5 Hybrid Withdrawn Jun 2024
AF1-177 Warren Generating Station 115 5 Gas In Service Sep 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Warren County, VA

All 14 PJM queue filings in Warren County, VA.

Other PJM queue substations in Warren County, PA

All 14 PJM queue filings in Warren County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first