Warren substation interconnection queue

2 active projects totalling 62 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
62active MW
6total filed
Queue IDProjectkVMWResourceStatus
G00_W40 Warren 138 kV 138 264 Gas Withdrawn
G40 Warren 230kV 230 260 Gas Withdrawn
S103 Warren Generating Station 115 57 Gas In Service
AF1-103 Warren 34.5 kV 34.5 20 Hybrid Withdrawn
AG1-481 Warren 34.5 kV 34.5 15.5 Hybrid Withdrawn
AF1-177 Warren Generating Station 115 5 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.