Remington substation interconnection queue
6 active projects totalling 317.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).
6active projects
317.6active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-2173 | Remington 230 kV | 230 | 250 | Battery | Active |
| AI2-001 | Remington 115 kV | 115 | 150 | Battery | Withdrawn |
| AG2-620 | Remington 230 kV | 230 | 100 | Battery | Withdrawn |
| S93 | Remington GT1 | 230 | 15 | Gas | In Service |
| S94 | Remington GT2 | 230 | 15 | Gas | In Service |
| S95 | Remington GT3 | 230 | 15 | Gas | In Service |
| S96 | Remington GT4 | 230 | 15 | Gas | In Service |
| AG2-178 | Remington 34.5 kV | 34.5 | 9.3 | Solar | Withdrawn |
| AB2-029 | Remington 34.5kV | 34.5 | 7.6 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.