Substation Scout

Remington substation interconnection queue

6 active projects totalling 317.6 MW in the PJM queue, plus 3 with terminal status (shown greyed).

6active projects
317.6active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-2173 Remington 230 kV 230 250 Battery Active
AI2-001 Remington 115 kV 115 150 Battery Withdrawn
AG2-620 Remington 230 kV 230 100 Battery Withdrawn
S93 Remington GT1 230 15 Gas In Service
S94 Remington GT2 230 15 Gas In Service
S95 Remington GT3 230 15 Gas In Service
S96 Remington GT4 230 15 Gas In Service
AG2-178 Remington 34.5 kV 34.5 9.3 Solar Withdrawn
AB2-029 Remington 34.5kV 34.5 7.6 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.