0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G26 England 138kV 138 350 Gas Withdrawn
T146 England n/r 69.2 Offshore Wind Withdrawn
T186 England n/r 4 Offshore Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.