Middle substation interconnection queue

1 active project totaling 8 MW in the PJM queue, plus 3 with terminal status (shown grayed).

4 PJM queue filings name Middle as the point of interconnection, all in Cape May County, NJ.

Target commercial operation dates as filed run from Dec 2008 to Apr 2029 (4 filings). 1 active filing targets a date after November 27, 2026.

1active projects
8active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
P07 Middle 138kV 138 122 Gas Withdrawn Dec 2008
T57 Middle n/r 22.2 Other Withdrawn Apr 2009
U1-065 Middle 69kV 69 20 Other Withdrawn May 2009
AF2-019 Middle Battery Storage 69 8 Battery Engineering and Procurement Apr 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Middle (ACE, 1 mention).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Other PJM queue substations in Cape May County, NJ

All 36 PJM queue filings in Cape May County, NJ.