Middle substation interconnection queue
1 active project totalling 8 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
8active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| P07 | Middle 138kV | 138 | 122 | Gas | Withdrawn |
| T57 | Middle | n/r | 22.2 | Other | Withdrawn |
| U1-065 | Middle 69kV | 69 | 20 | Other | Withdrawn |
| AF2-019 | Middle Battery Storage | 69 | 8 | Battery | Engineering and Procurement |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.