Middle substation interconnection queue

1 active project totalling 8 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
8active MW
4total filed
Queue IDProjectkVMWResourceStatus
P07 Middle 138kV 138 122 Gas Withdrawn
T57 Middle n/r 22.2 Other Withdrawn
U1-065 Middle 69kV 69 20 Other Withdrawn
AF2-019 Middle Battery Storage 69 8 Battery Engineering and Procurement

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.