Substation Scout

Cape May, NJ interconnection queue

6 active projects totalling 410.4 MW in the PJM queue, plus 30 with terminal status (shown greyed).

6active projects
410.4active MW
36total filed
Queue IDProjectkVMWResourceStatus
Y1-001 B.L. England Station 138 447 Gas Withdrawn
G26 England 138kV 138 350 Gas Withdrawn
C01-1934 Dennis 138 kV 138 180 Battery Active
P07 Middle 138kV 138 122 Gas Withdrawn
AE1-104 Ocean Wind LLC 138 121.4 Offshore Wind Suspended
C01-2259 Corson - Union 138 kV 138 100 Battery Active
AI2-326 BL England 138 kV 138 94.6 Offshore Wind Withdrawn
T84 Corson 138kV 138 70 Offshore Wind Withdrawn
T146 England n/r 69.2 Offshore Wind Withdrawn
Y2-110 BL England 138kV 138 40 Gas Withdrawn
T57 Middle n/r 22.2 Other Withdrawn
T169 Corson n/r 20 Battery Withdrawn
U1-065 Middle 69kV 69 20 Other Withdrawn
Y1-076 BL England 138kV 138 18.1 Gas Withdrawn
AF2-019 Middle Battery Storage 69 8 Battery Engineering and Procurement
V2-018 Tuckahoe n/r 7.6 Solar Withdrawn
W1-093 Cape May 12kV 12 7.6 Solar Withdrawn
W3-082 Woodbine Township n/r 7.6 Solar Withdrawn
T185 Lewis n/r 4 Offshore Wind Withdrawn
T186 England n/r 4 Offshore Wind Withdrawn
W3-058 Rio Grande 12kV 12 3.8 Solar Withdrawn
X3-013 Wildwood Crest 12kV 12 3 Solar Withdrawn
W1-096 Woodbine 12kV 12 2.7 Solar Withdrawn
U2-044 Lewis 138kV 138 2.6 Offshore Wind Withdrawn
U2-045 Fishermen's Atlantic City Windfarm (FACW) 69 2.6 Offshore Wind Withdrawn
W2-042 Dennis Township n/r 1.9 Solar Withdrawn
V1-021 Cape May County Municipal Utiltities Authority (CM 12 1 Gas In Service
X2-095 Cape May Court House 12kV 12 0.7 Solar Withdrawn
X3-024 Cape May Court House n/r 0.7 Solar Withdrawn
W4-063 Fishermen's Atlantic City Windfarm (FACW) 69 0.7 Offshore Wind Withdrawn
AB2-119 Middle Township 12kV 12 0.6 Solar Withdrawn
AB1-094 Rio Grande 12kV 12 0 Gas Withdrawn
W3-073 West Cape May 12kV 12 0 Solar Withdrawn
X1-110 Lower Township, NJ 12 0 Solar Withdrawn
Y1-077 Cape May Energy Center (CMEC) 138 0 Gas Withdrawn
Z2-082 Cape May County Municipal Utilities Authority Landfill 12 0 Gas In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.