Borgata D1 / D2

PJM queue ID J05

Borgata D1 / D2 (J05) is listed in the PJM interconnection queue as a 8 MW gas project in Atlantic County, NJ. The filing names Huron as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 30, 2003.

Queue IDJ05
Project nameBorgata D1 / D2
Status (as published)In Service
SubstationHuron
Point of interconnectionHuron 69kV
CountyAtlantic
StateNJ
Voltage69 kV
Capacity8 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2003-07-30
Source datasetserial

Same substation and county

Huron substation: 6 requests in the PJM queue, 2 active totaling 8 MW.

Queue IDProjectMWResourceStatus
Y3-012Marina Thermal Facility0GasIn Service
AA1-075Huron 23kV7.5GasWithdrawn
AB1-030Huron 69kV3.5GasWithdrawn
U2-045Fishermen's Atlantic City Windfarm (FACW)2.6Offshore WindWithdrawn
W4-063Fishermen's Atlantic City Windfarm (FACW)0.7Offshore WindWithdrawn

Atlantic, NJ: 93 requests in the PJM queue, 12 active totaling 301.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8
MW capacity8
MFO8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.