Borgata D1 / D2
PJM queue ID J05
Borgata D1 / D2 (J05) is listed in the PJM interconnection queue as a 8 MW gas project in Atlantic County, NJ. The filing names Huron as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of July 30, 2003.
| Queue ID | J05 |
|---|---|
| Project name | Borgata D1 / D2 |
| Status (as published) | In Service |
| Substation | Huron |
| Point of interconnection | Huron 69kV |
| County | Atlantic |
| State | NJ |
| Voltage | 69 kV |
| Capacity | 8 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2003-07-30 |
| Source dataset | serial |
Same substation and county
Huron substation: 6 requests in the PJM queue, 2 active totaling 8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Y3-012 | Marina Thermal Facility | 0 | Gas | In Service |
| AA1-075 | Huron 23kV | 7.5 | Gas | Withdrawn |
| AB1-030 | Huron 69kV | 3.5 | Gas | Withdrawn |
| U2-045 | Fishermen's Atlantic City Windfarm (FACW) | 2.6 | Offshore Wind | Withdrawn |
| W4-063 | Fishermen's Atlantic City Windfarm (FACW) | 0.7 | Offshore Wind | Withdrawn |
Atlantic, NJ: 93 requests in the PJM queue, 12 active totaling 301.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 8 |
| MW capacity | 8 |
| MFO | 8 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.