Beacon Solar
PJM queue ID AG1-553
Beacon Solar (AG1-553) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Rock Island County, IL. The filing names Cordova as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of January 15, 2030.
| Queue ID | AG1-553 |
|---|---|
| Project name | Beacon Solar |
| Status (as published) | EP |
| Substation | Cordova |
| Point of interconnection | Cordova 345 kV |
| County | Rock Island |
| State | IL |
| Voltage | 345 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-01-15 |
| Source dataset | cycle |
Same substation and county
Cordova substation: 6 requests in the PJM queue, 4 active totaling 265 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-462 | Gipper Solar Farm | 153 | Solar | EP |
| C01-1586 | Cordova 345 kV | 80 | Battery | Active |
| AG2-675 | Cordova 345 kV | 32 | Battery | Active |
| AH1-659 | Cordova 345 kV | 60 | Solar | Withdrawn |
| C01-1584 | Cordova 345 kV | 48 | Battery | Withdrawn |
Rock Island, IL: 8 requests in the PJM queue, 5 active totaling 283 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Beacon Solar, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 260.0 |
| MW capacity | 0.0 |
| MFO | 260.0 |
| Submitted date | 9/30/2020 |
| Last updated | 5/15/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.