Gipper Solar Farm

PJM queue ID AG1-462

Gipper Solar Farm (AG1-462) is listed in the PJM interconnection queue as a 153 MW solar project in Whiteside County, IL. The filing names Cordova as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 30, 2029.

Queue IDAG1-462
Project nameGipper Solar Farm
Status (as published)EP
SubstationCordova
Point of interconnectionCordova 345 kV
CountyWhiteside
StateIL
Voltage345 kV
Capacity153 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-30
Source datasetcycle

Same substation and county

Cordova substation: 6 requests in the PJM queue, 4 active totaling 265 MW.

Queue IDProjectMWResourceStatus
C01-1586Cordova 345 kV80BatteryActive
AG2-675Cordova 345 kV32BatteryActive
AG1-553Beacon Solar0SolarEP
AH1-659Cordova 345 kV60SolarWithdrawn
C01-1584Cordova 345 kV48BatteryWithdrawn

Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperGipper Solar Farm, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy255.0
MW capacity153.0
MFO255.0
Submitted date10/1/2020
Last updated4/23/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.