Gipper Solar Farm
PJM queue ID AG1-462
Gipper Solar Farm (AG1-462) is listed in the PJM interconnection queue as a 153 MW solar project in Whiteside County, IL. The filing names Cordova as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 30, 2029.
| Queue ID | AG1-462 |
|---|---|
| Project name | Gipper Solar Farm |
| Status (as published) | EP |
| Substation | Cordova |
| Point of interconnection | Cordova 345 kV |
| County | Whiteside |
| State | IL |
| Voltage | 345 kV |
| Capacity | 153 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | cycle |
Same substation and county
Cordova substation: 6 requests in the PJM queue, 4 active totaling 265 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1586 | Cordova 345 kV | 80 | Battery | Active |
| AG2-675 | Cordova 345 kV | 32 | Battery | Active |
| AG1-553 | Beacon Solar | 0 | Solar | EP |
| AH1-659 | Cordova 345 kV | 60 | Solar | Withdrawn |
| C01-1584 | Cordova 345 kV | 48 | Battery | Withdrawn |
Whiteside, IL: 13 requests in the PJM queue, 5 active totaling 246.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Gipper Solar Farm, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 255.0 |
| MW capacity | 153.0 |
| MFO | 255.0 |
| Submitted date | 10/1/2020 |
| Last updated | 4/23/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.