Cordova 345 kV

PJM queue ID C01-1586

Cordova 345 kV (C01-1586) is listed in the PJM interconnection queue as a 80 MW battery project in Rock Island County, IL. The filing names Cordova as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 28, 2031.

Queue IDC01-1586
Project nameCordova 345 kV
Status (as published)Active
SubstationCordova
Point of interconnectionCordova 345 kV
CountyRock Island
StateIL
Voltage345 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-04-28
Source datasetcycle

Same substation and county

Cordova substation: 6 requests in the PJM queue, 4 active totaling 265 MW.

Queue IDProjectMWResourceStatus
AG1-462Gipper Solar Farm153SolarEP
AG2-675Cordova 345 kV32BatteryActive
AG1-553Beacon Solar0SolarEP
AH1-659Cordova 345 kV60SolarWithdrawn
C01-1584Cordova 345 kV48BatteryWithdrawn

Rock Island, IL: 8 requests in the PJM queue, 5 active totaling 283 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperGipper Solar Farm, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy80.0
MW capacity80.0
MFO415.0
Submitted date4/27/2026
Last updated6/26/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.