Large-Load Tariff Records
What a utility's filed large-load tariff requires of a new large customer, quoted from the filing.
Why this exists
The agreement a data center signs with its utility is bilateral and not public. What is public is the tariff or rider that agreement is written against, and the commission docket that approved it.
Those filings carry the terms a large customer is held to: how many megawatts make a customer subject to the tariff, how long the contract must run, what share of contracted demand is billed whether or not it is used, how load may ramp, what security must be posted, and what it costs to leave. Each of those is a checkable statement about a document. This page records only that.
Records
One row per utility tariff, listed by name. The table shows the number each filing prints, where it prints one; minimum terms and billing are often conditional, so read the record for the wording and the quote behind it. Documents retrieved October 20, 2026.
| Utility | Status | Threshold | Minimum term | Minimum billing | Docket |
|---|---|---|---|---|---|
| Appalachian Power Company VA · State Corporation Commission |
Approved June 1, 2026 |
100 MW | 14 years | 80% | PUR-2025-00057 |
| Evergy Kansas Central, Inc. KS · Kansas Corporation Commission |
Effective November 6, 2025 |
75 MW | 12 years | 80% | 25-EKME-315-TAR |
| Evergy Missouri West, Inc. d/b/a Evergy Missouri West MO · Missouri Public Service Commission |
Effective March 9, 2026 |
75 MW | 12 years | 80% | EO-2025-0154 |
| Georgia Power Company GA · Georgia Public Service Commission |
Effective February 1, 2025 |
100 MW | see record | see record | 44280 |
| Indiana Michigan Power Company IN · Indiana Utility Regulatory Commission |
Effective February 19, 2025 |
70 MW | 12 years | 80% | Cause No. 46097 |
| Ohio Power Company (AEP Ohio) OH · Public Utilities Commission of Ohio |
Effective August 28, 2026 |
25 MW | see record | 85% | 24-508-EL-ATA26-113-EL-ATA25-392-EL-AIR |
| PPL Electric Utilities Corporation PA · Pennsylvania Public Utility Commission |
Effective July 1, 2026 |
50 MW | 10 years | 80% | R-2025-3057164 |
| Virginia Electric and Power Company (Dominion Energy Virginia) VA · State Corporation Commission |
Approved November 25, 2025 |
25 MW | 14 years | see record | PUR-2025-00058 |
Appalachian Power Company
State Corporation Commission · docket PUR-2025-00057 · EIA utility ID 733
| Tariff as filed |
Large Power Service Rate Schedule (Schedule L.P.S.) — revised Terms and Conditions for Large Load Customers “APCo’s Large Power Service Rate Schedule (“Schedule L.P.S.”)” Final Order p. 1 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
|---|---|
| Status |
approved since June 1, 2026 “The Hearing Examiner’s recommendations set forth in the Report are ordered.” Final Order p. 9, ordering para. (2); order dated 'AT RICHMOND, JUNE 1, 2026' (p. 1). The recommendations ordered include approval of the revised Schedule L.P.S. per Partial Stipulation Attachment 1, with modifications (p. 8). · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Filed |
2025-03-24 “On March 24, 2025, Appalachian Power Company (“APCo” or “Company”) filed a” Final Order p. 1 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Effective | Not found in the cited documents The Final Order sets no effective date; it orders APCo to file revised tariff sheets 'forthwith' (p. 9). The current VA S.C.C. Tariff No. 28 book contains Schedule L.P.S. pages stamped 'ACCEPTED FOR FILING ... July 13, 2026', but those pages have no extractable text layer (pdftotext output is garbled), so their effective-date line cannot be read or quoted. July 1, 2025 in the order is an applicability cut-off for new load, not a tariff effective date. |
| Applies to |
New load and expansions of existing load after July 1, 2025 with contract capacity greater than or equal to 100 MW at an individual site or 150 MW on an aggregated basis (Hearing Examiner finding 3, adopted). “than or equal to 100 MW at an individual site or 150 MW on an” Final Order p. 6, finding 3 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Minimum term |
Initial service contract term of 14 years, inclusive of a load ramp period of up to four years. “An initial service contract term for Large Load Customers of 14” Final Order p. 6, finding 4 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Minimum billing |
Monthly billing demand of 80%, as set forth in the Partial Stipulation and its Attachment 1; plus a minimum charge as set forth in the same attachment (finding 6). “A monthly billing demand of 80%, as set forth in the Partial” Final Order p. 6, findings 5-6 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Ramp schedule |
Load ramp period of up to four years, included within the 14-year initial term. “years, inclusive of a load ramp period of up to four years, is” Final Order p. 6, finding 4 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Collateral / security |
Collateral requirements as set forth in the Partial Stipulation and its Attachment 1, except that APCo and the customer may not negotiate different collateral requirements; cash collateral held by APCo should accrue interest. “requirements. In addition, cash collateral held by APCo pursuant to” Final Order p. 6, finding 7 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Exit terms |
After five years, with 42 months prior notice, a customer may reduce contract capacity up to 20% without an Exit Fee; terminating or reducing beyond 20% (also after five years, 42 months notice) is subject to an Exit Fee. APCo has a limited Exit Fee mitigation obligation; an Exit Fee dispute resolution provision applies. “its service contract or reduce its contract capacity beyond 20%, by” Final Order p. 7, findings 8-11 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Capacity reductions |
After five years, with 42 months prior notice, a customer may reduce contract capacity up to 20% without an Exit Fee; APCo and the customer may mutually agree on reductions beyond 20% in identified circumstances (terms in Partial Stipulation Attachment 1). “contract capacity up to 20% without payment of an Exit Fee by” Final Order p. 7, finding 8 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Assignment | Not found in the cited documents The Final Order does not address assignment or transfer of a Large Load Customer's contract (its 'reassigned' references concern capacity reassignment for Exit Fee mitigation). Partial Stipulation Attachment 1 was not archived; the accepted tariff pages have no readable text layer. |
| Note 1 |
The Commission adopted the finding that a separate rate class for Large Load Customers is not required at this time; the large-load terms sit inside existing Schedule L.P.S. “A separate rate class for Large Load Customers is not required at” Final Order p. 6, finding 2 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Note 2 |
APCo's original petition asked for a 12-year term, five-year notice, 80% minimum billing demand and increased collateral, effective on or after July 1, 2025; the Commission declined to place the schedule into effect on an interim basis (May 16, 2025 order). “Commission declined APCo’s request to place Rate” Final Order pp. 2-3 · Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) · retrieved 2026-10-20 |
| Note 3 |
Schedule L.P.S. pages in the current Tariff No. 28 book carry an SCC Public Utility Regulation 'ACCEPTED FOR FILING' stamp dated July 13, 2026; the page text itself does not extract. “July 13, 2026” Tariff No. 28, stamp on the Schedule L.P.S. pages following Sheet No. 15-2 · Appalachian Power VA S.C.C. Tariff No. 28 (standard rate schedules, September 24, 2026 update), utility-hosted · retrieved 2026-10-20 |
| Note 4 |
In its 2026 biennial review (Case No. PUR-2026-00044, pending), APCo proposes additional Schedule L.P.S. language clarifying large-load financial obligations and exit-cost mitigation, with companion language for its OAD and FOAD shopping tariffs. Proposed only; a monitor should watch this docket for changes to the terms above. “Propose additional language in the Terms and Conditions for the Company’s Rate” Castle Direct, Summary p. 1 · Direct Testimony of William K. Castle for APCo, Case No. PUR-2026-00044 (SCC document control no. 260610077) · retrieved 2026-10-20 |
Documents read
- Final Order, Case No. PUR-2025-00057 (Petition of Appalachian Power Company for approval of revisions to the Terms and Conditions of Rate Schedule L.P.S.) order · filed June 1, 2026 · retrieved 2026-10-20
- Appalachian Power VA S.C.C. Tariff No. 28 (standard rate schedules, September 24, 2026 update), utility-hosted tariff · retrieved 2026-10-20
- Direct Testimony of William K. Castle for APCo, Case No. PUR-2026-00044 (SCC document control no. 260610077) other · retrieved 2026-10-20
Evergy Kansas Central, Inc.
Kansas Corporation Commission · docket 25-EKME-315-TAR · EIA utility ID 22500 · also covers Evergy Kansas South, Inc. (EIA 10005)
| Tariff as filed |
Schedule LLPS, Large Load Power Service (Evergy Kansas Central, Inc. & Evergy Kansas South, Inc., d.b.a. Evergy Kansas Central; Evergy Kansas Central Rate Area) “SCHEDULE LLPS” Schedule LLPS, Sheet 1 header · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
|---|---|
| Status |
effective since November 6, 2025 “Approved JG Kansas Corporation Commission Effective November 6 2025 November 6, 2025” Schedule LLPS, Sheet 1 footer (KCC approval stamp) · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Filed |
2025-02-11 “A. Filed on February 11, 2025.” KCC Senate Utilities Committee update, 2026-01-15, slide "2a—Update on Recent Major KCC Dockets" · KCC Utilities Division Update, Senate Utilities Committee, January 15, 2026 · retrieved 2026-10-20 |
| Effective |
2025-11-06 “Effective November 6 2025” Schedule LLPS, every sheet footer · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Applies to |
Required for any new facility beginning service after the effective date with a peak load forecast reasonably expected to be equal to or in excess of a monthly maximum demand of 75 MW at any time during the Term, or any existing customer whose monthly maximum demand is reasonably expected to expand by 75 MW “equal to or in excess of a monthly maximum demand of seventy-five megawatts (75 MW) at any time during the Term” Schedule LLPS, Sheet 1, "Applicability" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Minimum term |
Minimum term of up to five years of an optional transitional load ramp period plus twelve years, commencing when permanent service begins; automatic five-year Extension Terms unless either party gives 36 months' notice “minimum term that includes up to five (5) years of an optional transitional load ramp period plus twelve (12) years” Schedule LLPS, Sheet 2, "Term" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Minimum billing |
Minimum Monthly Bill (Demand, Customer, Grid, Reactive Demand, Schedule TDC, future demand-based riders and Cost Stabilization Rider charges) determined using Minimum Demand, which is 80% of the annual Contract Capacity “Minimum Demand shall be 80% of the annual Contract Capacity.” Schedule LLPS, Sheet 3, "Determination of Demands"; Sheet 6, "Minimum Monthly Bill" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Ramp schedule |
Optional transitional load ramp of up to five years within the Term, during which load may be below 75 MW; the Contract Capacity schedule in the LLPS Service Agreement specifies peak load requirement during the Load Ramp; details may be addressed in the LLPS Service Agreement “During the transitional load ramp period, the Customer's maximum load may be lower than seventy-five megawatts (75 MW).” Schedule LLPS, Sheet 2, "Term"; Sheet 4, "Contract Capacity" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Collateral / security |
Collateral equal to two years of Minimum Monthly Bills, provided at execution of the LLPS Service Agreement and recomputed quarterly on a rolling 24-month load forecast; exemptions of 60% (cap $175M), 50% ($150M), 40% ($125M) or 25% ($75M) by credit rating and liquidity tiers; guarantee, letter of credit or cash; no interest accrues “provide collateral in an amount equal to two (2) years of Minimum Monthly Bills” Schedule LLPS, Sheets 7-11, "Collateral Requirements" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Exit terms |
Termination or schedule change before end of Term requires 36 months' written notice and an Exit Fee equal to the nominal Minimum Monthly Bill times months remaining (or 12 months, whichever is greater); Early Termination Fee adds two times the Minimum Monthly Bill per month of notice short of 36 months; Company may waive on a change of schedule if costs are fully covered “must provide written notice thirty-six (36) months prior to the requested date of termination or schedule change” Schedule LLPS, Sheets 6-7, "Termination or Change of Schedule" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Capacity reductions |
After the first five years of the term, Contract Capacity may be reduced without charge by up to 25 MW or 10% (whichever is lower) in total, with 24 months' notice for reductions of 25 MW or less; larger reductions require 36 months' notice and a Capacity Reduction Fee; reductions are permanent “by up to twenty-five megawatts (25 MW) or ten (10) percent of the Contract Capacity (whichever figure is lower on a MW basis)” Schedule LLPS, Sheets 4-5, "Contract Capacity" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Assignment | Not found in the cited documents Schedule LLPS Sheets 1-12 contain no provision on assigning the LLPS Service Agreement or transferring service to another customer. The only related text (Sheet 5) lets the Company vary notice terms if it "can reasonably reassign Contract Capacity"; recorded under Capacity reductions. |
| Note 1 |
The Commission approved a unanimous settlement agreement on November 6, 2025. The order and settlement themselves were not archived: the eStar links (estar.kcc.ks.gov) timed out / refused connection and the KCC Connect order page (order no. 251859) is a JavaScript app with no fetchable document. “Today, the Kansas Corporation Commission approved a unanimous settlement agreement creating a Large Load Power Service (LLPS) rate plan” KCC News Release, 2025-11-06 · KCC News Release, November 6, 2025: KCC approves large load rate plan with consumer protections · retrieved 2026-10-20 |
| Note 2 |
Unanimous Settlement Agreement filed August 18, 2025; evidentiary hearing October 8, 2025. “all active parties filed a Unanimous Settlement Agreement on August” KCC Senate Utilities Committee update, 2026-01-15 · KCC Utilities Division Update, Senate Utilities Committee, January 15, 2026 · retrieved 2026-10-20 |
| Note 3 |
Interim Capacity: where existing system capability cannot serve the load, the Company may procure market capacity under an Interim Capacity Agreement, billed to the customer as an Interim Capacity Adjustment demand charge. “the Company may enter into specific market contract agreements to provide the necessary capacity requirements of the Customer” Schedule LLPS, Sheet 4, "Interim Capacity" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Note 4 |
Service does not commence until the Company has sufficient capacity for the Contract Capacity. “Service to Customers under this schedule shall not commence until the Company has sufficient capacity to meet the Customer's Contract Capacity requirements.” Schedule LLPS, Sheet 11, "Additional Terms" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Note 5 |
The Company will consider reducing collateral after the customer reaches peak load and has operated above 100 MW for at least five years; cash collateral is credited at a 25% reduction (up to $40 million) during the first five years after execution. “operating above one hundred megawatts (100 MWs) for at least five (5) years” Schedule LLPS, Sheet 10 · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Note 6 |
Service at substation or transmission voltage only; transmission-voltage customers bear financial responsibility for the distribution substation. “Schedule LLPS Customers shall receive service at either substation or transmission voltage levels.” Schedule LLPS, Sheet 1, "Availability" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
| Note 7 |
Rates as filed: Customer Charge $386.67/month; Grid Charge $0.248/kW (substation) and $0.156/kW (transmission); Demand Charge $22.985/kW summer, $20.817/kW winter; Energy Charge $0.00872/kWh. Subject to RECA, EER, PTS, TA, TDC and Cost Stabilization Rider (CSR). “A. CUSTOMER CHARGE (per month): $386.67” Schedule LLPS, Sheet 3, "Rate" · Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) · retrieved 2026-10-20 |
Documents read
- Evergy Kansas Central Schedule LLPS, Large Load Power Service (Sheets 1-12, KCC-stamped approved Nov. 6, 2025) tariff · filed February 11, 2025 · retrieved 2026-10-20
- KCC News Release, November 6, 2025: KCC approves large load rate plan with consumer protections other · filed November 6, 2025 · retrieved 2026-10-20
- KCC Utilities Division Update, Senate Utilities Committee, January 15, 2026 other · filed January 15, 2026 · retrieved 2026-10-20
Evergy Missouri West, Inc. d/b/a Evergy Missouri West
Missouri Public Service Commission · docket EO-2025-0154 · EIA utility ID 12698 · also covers Evergy Metro, Inc. d/b/a Evergy Missouri Metro (EIA 10000)
| Tariff as filed |
Schedule LLPS, Large Load Power Service (EMW P.S.C. MO. No. 1, Sheets 187-193; EMM P.S.C. MO. No. 7, Sheets 76-82) “LARGE LOAD POWER SERVICE Schedule LLPS” P.S.C. MO. No. 1, Original Sheet No. 187 · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
|---|---|
| Status |
effective since March 9, 2026 “are approved to become effective on March 9, 2026” Order Approving Tariffs, issued 2026-02-25, ordered paragraph 1 · Order Approving Tariffs, Case No. EO-2025-0154, Tracking Nos. JE-2026-0103, -0104, -0105 · retrieved 2026-10-20 |
| Filed |
2025-02-14 “On February 14, 2025, Evergy Metro, Inc. d/b/a Evergy Missouri Metro (EMM) and” Report and Order, Procedural History · Report and Order, Case No. EO-2025-0154 (certified copy filed as Commission Exhibit 603 in Case No. ET-2025-0184) · retrieved 2026-10-20 |
| Effective |
2026-03-09 “are approved to become effective on March 9, 2026” Order Approving Tariffs, ordered paragraph 1 · Order Approving Tariffs, Case No. EO-2025-0154, Tracking Nos. JE-2026-0103, -0104, -0105 · retrieved 2026-10-20 |
| Applies to |
Required for any new facility beginning service after the effective date with a peak load forecast reasonably expected to be equal to or in excess of a monthly maximum demand of 75 MW at any time during the Term, or existing customers who expand, after March 9, 2026, by a reasonably expected 75 MW above pre-existing demand (expansion load only); qualifying customers may alternatively take Schedule MKT “equal to or in excess of a monthly maximum demand of seventy-five megawatts (75 MW) at any time during the Term” P.S.C. MO. No. 1, Original Sheet No. 187, "Applicability" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Minimum term |
Minimum term of up to five years of an optional transitional load ramp period plus twelve years, commencing when permanent service begins; automatic five-year Extension Terms unless either party gives 36 months' notice “minimum term that includes up to five (5) years of an optional transitional load ramp period plus twelve (12) years” P.S.C. MO. No. 1, Original Sheet No. 187, "Term" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Minimum billing |
Minimum Monthly Bill (Demand, Customer, Grid, Reactive Demand, future demand-based riders and Cost Stabilization Rider charges) determined using Minimum Demand, which is 80% of the annual Contract Capacity “Minimum Demand - Minimum Demand shall be 80% of the annual Contract Capacity.” P.S.C. MO. No. 1, 1st Revised Sheet No. 188, "Determination of Demands"; Sheet 190, "Minimum Monthly Bill" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Ramp schedule |
Optional transitional load ramp of up to five years within the Term, during which load may be below 75 MW; the Contract Capacity schedule specifies the peak load requirement during the Load Ramp; details may be addressed in the LLPS Service Agreement “During the transitional load ramp period, the Customer's maximum load may be lower than seventy-five megawatts (75 MW).” P.S.C. MO. No. 1, Original Sheet No. 187, "Term"; Sheet 189, "Contract Capacity" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Collateral / security |
Collateral equal to two years of Minimum Monthly Bills, provided at execution of the LLPS Service Agreement and recomputed quarterly on a rolling 24-month load forecast; exemptions of 60% (cap $175M), 50% ($150M), 40% ($125M) or 25% ($75M) by credit rating and liquidity tiers; guarantee, letter of credit or cash; no interest accrues “provide collateral in an amount equal to two (2) years of Minimum Monthly Bills” P.S.C. MO. No. 1, 1st Revised Sheets No. 191-193, "Collateral Requirements" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Exit terms |
Termination or schedule change before end of Term requires 36 months' written notice and an Exit Fee equal to the nominal Minimum Monthly Bill times months remaining (or 12 months, whichever is greater); Early Termination Fee adds two times the Minimum Monthly Bill per month of notice short of 36 months; Company may waive on a change of schedule if costs are fully covered “must provide written notice thirty-six (36) months prior to the requested date of termination or schedule change” P.S.C. MO. No. 1, 1st Revised Sheet No. 190, "Termination or Change of Schedule" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Capacity reductions |
After the first five years of the term, Contract Capacity may be reduced without charge by up to 25 MW or 10% (whichever is lower) in total, with 24 months' notice for reductions of 25 MW or less; larger reductions require 36 months' notice and a Capacity Reduction Fee; reductions are permanent “by up to twenty-five megawatts (25 MW) or ten (10) percent of the Contract Capacity (whichever figure is lower on a MW basis)” P.S.C. MO. No. 1, 1st Revised Sheet No. 189, "Contract Capacity" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Assignment | Not found in the cited documents EMW Schedule LLPS Sheets 187-193 (current rate book) and EMM Sheets 76-82 (EFIS 865971) contain no provision on assigning the LLPS Service Agreement. Sheet 189 lets the Company vary notice terms if it "can reasonably reassign Contract Capacity"; recorded under Capacity reductions. |
| Note 1 |
The Report and Order (issued November 13, 2025, effective December 13, 2025) authorized LLPS schedules consistent with the LLPS Rate Plan as modified by the Non-Unanimous Global Stipulation and Agreement filed September 25, 2025. “Evergy is authorized to file LLPS schedules consistent with the LLPS Rate Plan” Report and Order, ordered paragraph 1 · Report and Order, Case No. EO-2025-0154 (certified copy filed as Commission Exhibit 603 in Case No. ET-2025-0184) · retrieved 2026-10-20 |
| Note 2 |
The Commission described the 75 MW threshold as broader than the 100 MW minimum in SB4 (Section 393.130.7, RSMo). “clear eligibility threshold of 75 MW, that is even broader than the minimum 100 MW” Report and Order, Findings of Fact para. 21 · Report and Order, Case No. EO-2025-0154 (certified copy filed as Commission Exhibit 603 in Case No. ET-2025-0184) · retrieved 2026-10-20 |
| Note 3 |
Staff flagged that the filed expansion-load applicability language could allow some customers above 75 MW to be served on LPS rates without LLPS protections, and said it would address this in its Compliance Order filing. “could be served on usual LPS rates without the customer protections of the LLPS tariff provisions” Staff Recommendation, para. 13 · Staff Recommendation to Approve Tariffs, Case No. EO-2025-0154 · retrieved 2026-10-20 |
| Note 4 |
EMW Sheets 188-193 in the posted rate book are 1st Revised sheets issued July 27, 2026, effective August 26, 2026 (tracking JE-2027-0009), replacing the Original sheets approved March 9, 2026; Sheet 187 remains the Original (JE-2026-0105). The commission order for JE-2027-0009 was not located or archived; the record's terms are quoted from the revised sheets. “FILED - Missouri Public Service Commission - 08/26/2026 - JE-2027-0009” P.S.C. MO. No. 1, 1st Revised Sheets No. 188-193 (filing stamp) · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Note 5 |
Compliance tariffs: JE-2026-0103 and JE-2026-0104 (Evergy Missouri Metro) and JE-2026-0105 (Evergy Missouri West), filed February 5, 2026, substituted February 13 and 17, 2026. “Tariff Tracking Nos. JE-2026-0103, JE-2026-0104, and JE-2026-0105 to comply” Order Approving Tariffs, p. 1 · Order Approving Tariffs, Case No. EO-2025-0154, Tracking Nos. JE-2026-0103, -0104, -0105 · retrieved 2026-10-20 |
| Note 6 |
The Company will annually consider reducing collateral after the customer reaches peak load and has operated above 75 MW for at least three years (the Kansas schedule uses 100 MW and five years). “operating above seventy-five megawatts (75 MWs) for at least three (3) years” P.S.C. MO. No. 1, 1st Revised Sheet No. 192 · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Note 7 |
Interim Capacity: where existing system capability cannot serve the load, the Company may procure market capacity under an Interim Capacity Agreement, billed as an Interim Capacity Adjustment demand charge. “the Company may enter into specific market contract agreements to provide the necessary capacity” P.S.C. MO. No. 1, 1st Revised Sheet No. 188, "Interim Capacity" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Note 8 |
Service does not commence until the Company has sufficient capacity for the Contract Capacity. “Service to Customers under this schedule shall not commence until the Company has sufficient capacity to meet the Customer's Contract Capacity requirements.” P.S.C. MO. No. 1, Sheet 193, "Additional Terms" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
| Note 9 |
EMW rates as posted: Customer Charge $675.00/month; Grid Charge $4.811/kW (substation), $4.750/kW (transmission); Demand Charge $17.074/kW summer, $15.074/kW winter; Energy Charge $0.02881/kWh. EMM rates are on its own sheets and were not transcribed. Subject to FAC, TA, DSIM, CSR, SUR and RESRAM. “Per kW of Grid Demand per month-Substation $4.811 $4.811” P.S.C. MO. No. 1, 1st Revised Sheet No. 188, "Rate" · Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) · retrieved 2026-10-20 |
Documents read
- Evergy Missouri West rate book, P.S.C. MO. No. 1 (Schedule LLPS at Sheets 187-193; current posted version) tariff · retrieved 2026-10-20
- Evergy Missouri Metro Schedule LLPS tariff sheets, P.S.C. MO. No. 7, Sheets 76-82 (and related riders), filed in EO-2025-0154 tariff · retrieved 2026-10-20
- Order Approving Tariffs, Case No. EO-2025-0154, Tracking Nos. JE-2026-0103, -0104, -0105 order · filed February 25, 2026 · retrieved 2026-10-20
- Report and Order, Case No. EO-2025-0154 (certified copy filed as Commission Exhibit 603 in Case No. ET-2025-0184) order · filed November 13, 2025 · retrieved 2026-10-20
- Staff Recommendation to Approve Tariffs, Case No. EO-2025-0154 other · filed February 18, 2026 · retrieved 2026-10-20
Georgia Power Company
Georgia Public Service Commission · docket 44280 · EIA utility ID 7140
| Tariff as filed |
Rules and Regulations for Electric Service, Section A (General Rules) paragraph 1 and Section D (Transmission or Wholesale Distribution Line Extension and Service Connection Regulations) paragraphs 2, 13 and 14 — the 100 MW large-load provisions “As a condition of serving or preparing to serve a customer or prospective customer with” Rules and Regulations for Electric Service, Page Number 1.41-1.42 (Section D, para. 13) · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
|---|---|
| Status |
effective since February 1, 2025 “the Commission hereby approves the revisions to the Company’s rules and regulations as requested by Georgia Power Company in its December 11, 2024 filing, as modified by Staff” Order Approving Revisions, Docket 44280 (voted at the January 23, 2025 Administrative Session), ordering paragraph. Effective February 1, 2025 per the revision footers of the Rules (see effectiveDate). · Georgia PSC — Order Approving Revisions to Georgia Power Company's Rules and Regulations, Docket No. 44280 (Word file) · retrieved 2026-10-20 |
| Filed |
2024-12-11 “Re: Request for Approval of Revisions to Georgia Power Company’s Rules” Georgia Power letter to Executive Secretary dated December 11, 2024, p. 1 · Georgia Power — Request for Approval of Revisions to Rules and Regulations, Docket No. 44280 (with proposed tariff pages) · retrieved 2026-10-20 |
| Effective |
2025-02-01 “Paragraphs 13 and 14 added February 1, 2025” Rules and Regulations for Electric Service, Section D revision footer (also Section A footer: "Paragraph 1 revised February 1, 2025") · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
| Applies to |
A customer or prospective customer with an expected peak demand of 100 MW or greater at one or more premises located on one tract or contiguous tracts of land “an expected peak demand of 100 MW or greater at one or more premises located on” Rules and Regulations for Electric Service, Section D, para. 13 · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
| Minimum term |
No fixed minimum stated in the Rules. The Company may require a longer term of contract than the default (one year under Rule A1) or than the term in the applicable rate schedule, when it deems it appropriate to recover all costs of serving or preparing to serve the customer; the term is set in the customer's contract. “requirements and a longer term of contract, when the Company deems it appropriate to ensure the” Rules and Regulations for Electric Service, Page Number 1.10, Section A, para. 1 (see also Section D, para. 2) · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
| Minimum billing |
The Company may require minimum billing requirements for customers of 100 MW or greater; no amount or percentage is stated in the Rules. Amounts are set per contract. “require additional terms and conditions of electric service, including, without limitation, minimum billing” Rules and Regulations for Electric Service, Page Number 1.10, Section A, para. 1 · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
| Ramp schedule | Not found in the cited documents No ramp or load-ramp schedule appears in the Rules (Sections A and D), in Schedule TOU-SC-16, in the December 11, 2024 application, or in the August 26, 2026 joint statement. Ramp terms, if any, would sit in individual contracts, which were not reviewed. |
| Collateral / security |
The Company may require and call upon performance and credit provisions it deems appropriate to protect the Company and ensure recovery of costs incurred in serving or preparing to serve the customer; no form or amount is stated. “performance and credit provisions it deems appropriate to protect the Company and” Rules and Regulations for Electric Service, Section D, para. 13 · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
| Exit terms |
On termination of its contract for electric service, the customer may be required to pay any costs the Company incurred in serving or preparing to serve it, including but not limited to distribution, transmission and generation costs. “Company, upon termination of its contract for electric service, to pay any costs the” Rules and Regulations for Electric Service, Section D, para. 14 · Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) · retrieved 2026-10-20 |
| Capacity reductions | Not found in the cited documents No capacity-reduction allowance appears in the Rules (Sections A and D), Schedule TOU-SC-16, the December 11, 2024 application or the August 26, 2026 joint statement; reduction terms, if any, would sit in individual contracts, which were not reviewed. |
| Assignment | Not found in the cited documents No assignment or transfer provision specific to 100 MW customers in the Rules (Sections A and D), Schedule TOU-SC-16, the December 11, 2024 application, or the August 26, 2026 joint statement. |
| Note 1 |
A Staff/Company joint statement filed in the docket on 2026-08-26 names the January 28, 2025 order approving the rules revisions and the April 17, 2025 order on the compliance filing. “January 28, 2025, Order Approving Revisions to Georgia Power’s Rules and Regulations, and” Joint Statement of PSC Staff and Georgia Power, filed 08/26/2026, Docket # 44280, Document # 228126, p. 1 · Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) · retrieved 2026-10-20 |
| Note 2 |
The approving orders set a contract review process: Staff reviews each 100 MW+ contract, and the joint statement reports Staff has reviewed six prior large-load contracts under it. Contract-specific terms (minimum bill amounts, termination payments, collateral) are in the contracts, not the Rules. “The Staff has reviewed six prior Large Load contracts under this Large Load” Joint Statement, Docket # 44280, Document # 228126, p. 1 · Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) · retrieved 2026-10-20 |
| Note 3 |
If a large-load customer uses the contract termination provision before the initial term ends, the Company will send the Commission a letter within 15 days of receiving the termination notice. “provide a letter to the Commission within 15 days of the Company’s receipt of termination” Joint Statement, Docket # 44280, Document # 228126, p. 1 · Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) · retrieved 2026-10-20 |
| Note 4 |
On early termination of a Large Load Data Center Customer contract, the Company agrees that in future ratemaking it will not seek to recover from Non-Large Load customers any 'Incremental Cost Revenue Deficiency' for the remaining term (net of termination payments, mitigation and net benefits); the Commission decides whether and how any unmitigated deficiency is recovered, including allocation to other Large Load customers. “future ratemaking proceedings, it shall not seek to recover from Non-Large Load customers” Joint Statement, Docket # 44280, Document # 228126, p. 2 · Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) · retrieved 2026-10-20 |
| Note 5 |
Reporting: in addition to the quarterly Large Load Economic Development Report, the Company will file a semi-annual public report on its Large Load Data Center Customer portfolio and a public summary of each contract filed for Staff review. “the Company will file a semi-annual public report that provides (1) an overview of the” Joint Statement, Docket # 44280, Document # 228126, p. 2 · Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) · retrieved 2026-10-20 |
| Note 6 |
The joint statement links large-load revenue to the base-rate freeze in Docket 44280 and the Stipulation in Docket Nos. 56298 and 56310 (the IRP/capacity certification dockets), which are related but are not where the large-load rule was adopted. “in Docket Nos. 56298 and 56310, the Company further agreed to file the July 1, 2028, base” Joint Statement, Docket # 44280, Document # 228126, p. 2 · Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) · retrieved 2026-10-20 |
| Note 7 |
Schedule TOU-SC-16: customers of 100 MW or greater may take service under the Standard Price Option only if they contracted for it before February 1, 2025. “one tract or contiguous tracts of land may only take service under the Standard Price Option if they” Schedule TOU-SC-16, p. 1 of 3 (Page No. 6.10), effective with bills rendered for June 2026 · Georgia Power Electric Service Tariff — Time of Use - Supplier Choice, Schedule TOU-SC-16 (utility-hosted) · retrieved 2026-10-20 |
| Note 8 |
Schedule TOU-SC-16 Monthly Access Charge Option (available to 100 MW+ customers): a customer-specific Monthly Access Charge (MAC) computed on cost to serve; the MAC may not be lowered except by Commission action; the minimum monthly bill is the MAC plus riders unless the Contract for Electric Service sets a specific minimum; the Contract specifies amounts payable on termination; term of contract three years or as specified in the Contract. “The CES will specify the amounts the customer must pay in the event of” Schedule TOU-SC-16, p. 3 of 3 (Page No. 6.10), Monthly Access Charge Option · Georgia Power Electric Service Tariff — Time of Use - Supplier Choice, Schedule TOU-SC-16 (utility-hosted) · retrieved 2026-10-20 |
| Note 9 |
Schedule TOU-SC-16 Monthly Access Charge floor: the MAC may not be less than the minimum MAC level set by Georgia Power for that location. “case shall this MAC be less than the minimum MAC level established by Georgia Power for that specific” Schedule TOU-SC-16, p. 3 of 3 (Page No. 6.10) · Georgia Power Electric Service Tariff — Time of Use - Supplier Choice, Schedule TOU-SC-16 (utility-hosted) · retrieved 2026-10-20 |
| Note 10 |
The April 2025 order on the tariff compliance filing adopted Staff’s recommendations (voted at the April 15, 2025 Administrative Session). “that Staff’s recommendations on Georgia Power Company’s Revision to Rules and Regulations Tariff Compliance Filing, are hereby adopted” Order on Tariff Compliance Filing, Docket 44280, ordering paragraph · Georgia PSC — Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing, Docket No. 44280 (Word file) · retrieved 2026-10-20 |
Documents read
- Georgia Power Company — Rules, Regulations and Rate Schedules for Electric Service (current tariff book, utility-hosted) tariff · retrieved 2026-10-20
- Georgia Power — Request for Approval of Revisions to Rules and Regulations, Docket No. 44280 (with proposed tariff pages) application · filed December 11, 2024 · retrieved 2026-10-20
- Georgia PSC — Order Approving Revisions to Georgia Power Company's Rules and Regulations, Docket No. 44280 (Word file) order · filed January 28, 2025 · retrieved 2026-10-20
- Georgia PSC — Order on Georgia Power Company's Revision to Rules and Regulations Tariff Compliance Filing, Docket No. 44280 (Word file) order · filed April 17, 2025 · retrieved 2026-10-20
- Georgia PSC — Order on Tariff Compliance Filing, Docket No. 44280 (signed scanned PDF of the same order; no text layer, no quotes drawn from it) order · retrieved 2026-10-20
- Joint Statement of the Georgia PSC Staff and Georgia Power Company Regarding Large Load Contract Deemed Filed July 27, 2026 (Docket # 44280, Document # 228126) other · filed August 26, 2026 · retrieved 2026-10-20
- Georgia Power Electric Service Tariff — Time of Use - Supplier Choice, Schedule TOU-SC-16 (utility-hosted) tariff · retrieved 2026-10-20
Indiana Michigan Power Company
Indiana Utility Regulatory Commission · docket Cause No. 46097 · EIA utility ID 9324
| Tariff as filed |
Tariff I.P. (Industrial Power), Terms and Conditions for Customer at or Over 70 MW Individually or 150 MW in the Aggregate “Terms and Conditions for Customer at or Over 70 MW Individually or 150 MW in the Aggregate.” I.U.R.C. No. 20, First Revised Sheet No. 21.3 · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
|---|---|
| Status |
effective since February 19, 2025 “as modified by the Settlement Agreement and shown” Order, Ordering Paragraph 2 (p. 49); approved Feb 19 2025. Effective status from compliance sheets 21.3-21.6 in the current tariff book, issued under Cause No. 46097, effective on and after February 19, 2025 · IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) · retrieved 2026-10-20 |
| Filed |
2024-07-19 “On July 19, 2024, Indiana Michigan Power Company (“I&M” or “Petitioner”) filed its” Order p. 1 (Verified Petition filing date) · IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) · retrieved 2026-10-20 |
| Effective |
2025-02-19 “ON AND AFTER FEBRUARY 19, 2025” I.U.R.C. No. 20, Sheets 21.1-21.6 footer (Sheet 21.7, Collateral Requirements, was later revised effective June 24, 2026; see notes) · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Applies to |
Contract capacity greater than or equal to 70 MW (or reasonably expected to grow to exceed 70 MW) at an individual plant, or 150 MW at one or more aggregated premises each of 1 MW or larger; new load or expansions on or after January 1, 2024 “These provisions apply to customers whose contract capacity is greater than or equal to 70 MW or is reasonably” I.U.R.C. No. 20, First Revised Sheet No. 21.3, Applicability · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Minimum term |
Initial Contract Term of not less than 12 years, commencing after any Load Ramp Period; Contract Term = Load Ramp Period plus Initial Contract Term; 42 months written notice to discontinue “The Large Load Customer’s Initial Contract Term will be made for a period of not less than 12 years.” I.U.R.C. No. 20, First Revised Sheet No. 21.3, Contract Term · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Minimum billing |
Monthly Billing Demand not less than the greater of 80 percent of contract capacity for the applicable period of the Contract Term or 80 percent of the highest Monthly Billing Demand in the past 11 months “event be less than the greater of (a) 80 percent of the Large Load Customer's contract capacity specified for” I.U.R.C. No. 20, Original Sheet No. 21.5, Monthly Billing Demand · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Ramp schedule |
Customer may designate a Load Ramp Period of no more than five years, running until maximum contract capacity is billed; ramp levels are defined in the Electric Services Agreement “Load Customer may designate a Load Ramp Period, which can be no greater than five (5) years.” I.U.R.C. No. 20, First Revised Sheet No. 21.3, Contract Term · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Collateral / security |
Collateral equal to 24 times the maximum expected monthly non-fuel bill (first year) or previous maximum monthly non-fuel bill (thereafter), recomputed annually, due within 10 business days of contract signing; exempt with A-/A3 ratings and liquidity over 10x; unrated customers with liquidity over 10x exempt from 50 percent, capped at $250 million; parent guarantee, letter of credit, or cash “days of contract signing is equal to twenty-four (24) multiplied by: (a) during the first year of the contract, the” I.U.R.C. No. 20, First Revised Sheet No. 21.7, Collateral Requirements (effective June 24, 2026, 30-Day Filing No. 50910) · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Exit terms |
After the first five years, termination or reduction beyond 20 percent on at least 42 months notice before the PJM Delivery Year, subject to an Exit Fee equal to the remaining Minimum Charge on the capacity above the 20 percent allowance, over an Exit Fee Period of one to five years; I&M to use reasonable efforts to mitigate the fee “Exit Fee Period shall not be less than one (1) year and shall not exceed five (5) years.” I.U.R.C. No. 20, Original Sheet No. 21.4, Contract Capacity Reductions · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Capacity reductions |
A Large Load Customer may cut contract capacity by up to 20 percent in total, with no Exit Fee, after the first five years, on 42 months notice before the PJM Delivery Year. “Large Load Customer may, without payment of an Exit Fee or any penalty, reduce its contract capacity at any” I.U.R.C. No. 20, Original Sheet No. 21.4 · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Assignment |
No assignment of rights or delegation of obligations without the Company's written consent, which is not to be unreasonably withheld; assignment does not relieve financial obligation unless the Company consents in writing “Large Load Customer shall not assign any of its rights or delegate any of its obligations under the Contract” I.U.R.C. No. 20, Original Sheet No. 21.5 · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Note 1 |
The Commission modified the settlement: any mutually agreed reduction in contract capacity beyond 20 percent must be submitted to the Commission for review and approval before it takes effect. “Any reduction in contract capacity beyond 20% that is mutually agreed upon” Order, Ordering Paragraph 3 (p. 49) · IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) · retrieved 2026-10-20 |
| Note 2 |
The Large Load minimum monthly charge adds a Step 1 Embedded Capacity Charge ($/kW by voltage: 13.289 secondary, 12.427 primary, 12.271 subtransmission, 10.959 transmission) and the demand charges of all applicable demand-related riders, each times the Monthly Billing Demand. “the product of the Step 1 Embedded Capacity Charge and the Monthly Billing Demand” I.U.R.C. No. 20, Original Sheet No. 21.6, Minimum Charge · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Note 3 |
Permanent closure must be reported to the Company within three business days of the decision. “permanent closure, the customer shall notify the Company within three (3) business days of making this” I.U.R.C. No. 20, Original Sheet No. 21.4 · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Note 4 |
Sheet 21.7 (Collateral Requirements) was revised after the order to add a 10-business-day deadline. It is effective on and after June 24, 2026, under IURC 30-Day Filing No. 50910, and replaces the version approved in Cause No. 46097. “IN 30-DAY FILING NO. 50910” I.U.R.C. No. 20, First Revised Sheet No. 21.7 footer · Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) · retrieved 2026-10-20 |
| Note 5 |
In the Cause No. 46301 settlement, I&M agreed to propose a collateral deadline for these customers and implement it by July 1, 2026. I&M also agreed to present a study and propose changes to its new large load extension-of-service policy in its next base rate case. “requirement must be met and implement approved revisions by July 1, 2026.” Order in Cause No. 46301 (Jan 28 2026), settlement summary · IURC Order, Cause No. 46301 (approved Jan 28 2026), I&M generation resource plan settlement · retrieved 2026-10-20 |
| Note 6 |
Full Planning Studies (steady-state and dynamic) required because a Large Load Customer may be added are paid solely by that customer (Settlement Section I.A.8). “that Full Planning Studies, including steady-state and dynamic studies, required because of the” Order p. 41, Section H · IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) · retrieved 2026-10-20 |
| Note 7 |
I&M must file semi-annual Large Load Customer reports in this Cause, the first within six months of the order. The confidential portions are held as trade secret. “I&M shall file semi-annual Large Load Customer reports under this Cause” Order, Ordering Paragraph 6 (p. 50) · IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) · retrieved 2026-10-20 |
| Note 8 |
Special contracts for Large Load Customers stay available. I&M will bring them to the Commission under Ind. Code 8-1-2-24 and -25. “provides clarity with respect to service under Tariff I.P. and appropriately recognizes Indiana’s” Order p. 41, Section G · IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) · retrieved 2026-10-20 |
Documents read
- IURC Order, Cause No. 46097 (approved Feb 19 2025), with attached Stipulation and Settlement Agreement and Attachment A (Tariff I.P.) order · filed February 19, 2025 · retrieved 2026-10-20
- Indiana Michigan Power Company, I.U.R.C. No. 20 Schedule of Tariffs (Indiana), tariff book (file name dated 09-29-2026) tariff · retrieved 2026-10-20
- IURC Order, Cause No. 46301 (approved Jan 28 2026), I&M generation resource plan settlement order · filed January 28, 2026 · retrieved 2026-10-20
Ohio Power Company (AEP Ohio)
Public Utilities Commission of Ohio · docket 24-508-EL-ATA; 26-113-EL-ATA; 25-392-EL-AIR · EIA utility ID 14006
| Tariff as filed |
Schedule DCT (Data Center Tariff) “DCT Data Center Tariff 223-1 thru 223-8 August 28, 2026” P.U.C.O. No. 22, Table of Contents, Sheet No. 101-1 · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
|---|---|
| Status |
effective since August 28, 2026 “Issued: August 28, 2026 Effective: August 28, 2026” P.U.C.O. No. 22, 1st Revised Sheet Nos. 223-1 through 223-8, footer · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Filed |
2024-05-13 “WHEREAS, on May 13, 2024, AEP Ohio filed an Application not for an increase in” Joint Stipulation and Recommendation (Oct. 23, 2024), §II Recitals, p. 2 · Joint Stipulation and Recommendation, PUCO Case No. 24-508-EL-ATA (Oct. 23, 2024), as filed as Exhibit JP-1S in Utah PSC Docket 24-035-04 · retrieved 2026-10-20 |
| Effective |
2026-08-28 “Issued: August 28, 2026 Effective: August 28, 2026” P.U.C.O. No. 22, 1st Revised Sheet Nos. 223-1 through 223-8, footer. This is the effective date of the current revision; the effective date of the original Schedule DCT under Case No. 24-508-EL-ATA is not printed in any archived document (the July 11, 2025 compliance sheets leave Issued/Effective blank). · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Applies to |
Customers that operate a Data Center (Existing Load and New Load) that will use, within the initial contract term, a monthly maximum demand of greater than 25,000 kW at a Single Location or an aggregated Total Customer Contract Capacity in Service Territory of greater than 25,000 kW “(both Existing Load and New Load) that will use, within the initial contract term, a monthly maximum” Sheet No. 223-2, Availability of Service · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Minimum term |
New Load: initial period of not less than the Load Ramp Period plus 8 years (example given: 4-year Load Ramp Period gives a 12-year initial period). Existing Load keeps the terms of its existing Contract. “Load Ramp Period plus 8 years. By way of example, the initial period of a Contract for a Data Center with” Sheet No. 223-5, Terms of Contract – New Load · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Minimum billing |
New Load: during the Load Ramp Period, billing demand not less than 85% of Load Ramp Contract Capacity; after it, not less than the greater of (a) 85% of the highest billing demand in the past 11 months or (b) a tiered Minimum Demand (25,001-75,000 kW: 15,000 kW plus 85% of the amount over 25,000 kW; 75,001 kW and above: 57,500 kW plus 100% of the amount over 75,000 kW, capped at 85% of total contract capacity). Existing Load: not less than 60% of contract capacity or of the highest billing demand in the past 11 months. “monthly billing demand shall not be less than 85% of the customer’s Load Ramp Contract Capacity.” Sheet Nos. 223-3 to 223-4, Monthly Billing Demand – Existing Load / New Load · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Ramp schedule |
Load Ramp Period of no more than four years; Load Ramp Contract Capacity not less than 50% of Contract Capacity in Year 1, 65% in Year 2, 80% in Year 3, 90% in Year 4. “contract capacity, which shall not exceed four years.” Sheet Nos. 223-1 to 223-2, Definitions (Load Ramp Contract Capacity, Load Ramp Period) · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Collateral / security |
New Load without both an A-/A3 credit rating (S&P/Moody's) and Liquidity greater than ten times the Collateral Requirement must provide a guarantee or collateral at contract signing equal to 50% of total minimum charges for the full contract term, as a qualifying parent/affiliate guarantee, a standby irrevocable letter of credit, or cash; reduced by one year's minimum charges for each year energized with on-time payments. Existing Load follows its existing LOA/ESA collateral terms. “the time of signing the contract equal to 50% of the total minimum charges for the full term of the contract” Sheet Nos. 223-6 to 223-7, Collateral Requirement – New Load · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Exit terms |
During the initial term the customer is financially responsible for minimum charges regardless of curtailing, reducing, suspending or terminating service. After completion of the fifth year after the Load Ramp Period, the customer may pay an exit fee equal to minimum charges for 36 months after notice of termination and then terminate. After the initial term, either party may terminate on written notice no later than three years before the requested termination date. “the Contract after the Load Ramp Period the customer chooses to pay an exit fee equal to minimum” Sheet No. 223-6, Terms of Contract – New Load (continued) · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Capacity reductions | Not found in the cited documents Schedule DCT sheets 223-1 to 223-8 contain no capacity-reduction allowance; reductions during the initial term leave the customer responsible for minimum charges (see Exit terms). A stipulation-stage reallocation proposal is in notes. |
| Assignment | Not found in the cited documents Schedule DCT (1st Revised Sheets 223-1 to 223-8) contains no provision on assigning the contract. The October 2024 Joint Stipulation §III.G proposed letting a customer assign up to 25% of contract capacity to another DCT customer; that text is not in the current sheets and the order adopting the stipulation could not be retrieved, so it is recorded in notes only. |
| Note 1 |
PUCO meeting minutes record the July 9, 2025 vote approving the proposed Opinion and Order in 24-508-EL-ATA, 5-0. The order text itself was not retrievable (PUCO DIS rejects automated requests), so status rests on the minutes and the utility's filed tariff sheets. “(Proposed Opinion and order) and seconded,” Minutes, item 2 (24-508-EL-ATA Ohio Power Company) · PUCO Commission meeting minutes, July 9, 2025 · retrieved 2026-10-20 |
| Note 2 |
PUCO meeting minutes record approval of a Finding and Order in 26-113-EL-ATA (Ohio Power Company) on August 5, 2026, vote 3-0. The current Schedule DCT sheets cite this order and the April 1, 2026 order in rate case 25-392-EL-AIR. “26-113-EL-ATA Ohio Power Company” Minutes, item 3 · PUCO Commission meeting minutes, August 5, 2026 · retrieved 2026-10-20 |
| Note 3 |
Interim SSO procedures under the August 5, 2026 Finding and Order in 26-113-EL-ATA: a DCT customer returning to or starting on the Standard Service Offer must give no less than 180 days' advance written notice; the Company runs a separate procurement for that load at the customer's full cost; without notice the Company obtains collateral and procures through PJM spot market purchases assigned solely to the customer; the Company takes on no obligation to procure capacity for returning load. “the following Interim Procedures shall apply until otherwise ordered by the Commission.” Sheet Nos. 223-4 to 223-5, Generation Service · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 4 |
Rates at transmission voltage (schedule codes 297,797): customer charge $6,800 and a Supplemental Customer Charge of $20,000, which is not a base distribution rate and does not apply to Existing Load. “**This is not a base distribution rate and will not be included in base distribution rider charges and will not” Sheet No. 223-3, Monthly Rate · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 5 |
Existing Load (LOA/ESA signed by the Effective Date of Schedule DCT) keeps its existing contract terms; an expansion of more than 25,000 kW above existing contract capacity is New Load. Existing Load minimum billing demand is 60%. “monthly billing demand established hereunder shall not be less than 60% of (a) the customer contract” Sheet Nos. 223-2 to 223-3, Definitions; Monthly Billing Demand – Existing Load · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 6 |
Affiliated New Loads are aggregated to determine Total Customer Contract Capacity in Service Territory and the Minimum Demand tier, stacked in order of energization date. “All affiliated New Load will be stacked” Sheet No. 223-4 · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 7 |
New Load is not eligible for the 1CP or 6CP BTCR (transmission) programs; Existing Load already on those pilots may stay until the end of ESP V. “schedule are not eligible to participate in the 1CP or 6CP BTCR Programs or any successor programs.” Sheet No. 223-5, Transmission Service · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 8 |
Site control: to sign a contract the customer must designate a specific site and own or have the exclusive right to use the land. “Center project will be constructed and served by the Company, and the customer must own or have the” Sheet No. 223-6 · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 9 |
Behind-the-meter generation may offset Contract Capacity only with equipment that can instantaneously curtail load equal to or greater than the generation output; with Commission approval, service may be suspended if usage exceeds Contract Capacity by more than 1,000 kW. “Electric Service Agreement to instantaneously curtail load equal to or greater than the behind-the-meter” Sheet No. 223-7, Customer-Owned Generation and Emergency Conditions · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 10 |
Mobile Data Centers (which the definition says includes mining of cryptocurrency) must provide a sworn statement that they are not affiliated with or acting on behalf of any foreign adversary as defined in 15 C.F.R. § 7.4. “Prior to receiving service, Mobile Data Center customers will be required to provide a sworn statement,” Sheet No. 223-8, Special Terms and Conditions · Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 · retrieved 2026-10-20 |
| Note 11 |
The July 2025 compliance tariff (P.U.C.O. No. 21) defined "customer" for collateral purposes to include a financial sponsor that co-signs the contract, per the order's modification at Paragraph 126. That sentence does not appear in the collateral section of the current P.U.C.O. No. 22 Sheet 223-6; whether it moved elsewhere or was removed was not determined. “and the customer’s financial sponsor as long as the sponsor is a co-signer on the contract with AEP Ohio” Compliance tariff, Collateral Requirement section; cover letter of July 11, 2025 · Ohio Power Company compliance tariffs (Schedule DCT, P.U.C.O. No. 21) in response to the July 9, 2025 Opinion and Order, Case No. 24-508-EL-ATA (PUCO-docketed filing; copy hosted by Ohio Capital Journal) · retrieved 2026-10-20 |
| Note 12 |
The compliance filing letter says that once the compliance tariff is approved, the temporary moratorium on new data center load ends (Paragraph 130 of the Opinion and Order). “Opinion and Order, the temporary moratorium will end and going forward AEP” Cover letter, July 11, 2025, p. 1 · Ohio Power Company compliance tariffs (Schedule DCT, P.U.C.O. No. 21) in response to the July 9, 2025 Opinion and Order, Case No. 24-508-EL-ATA (PUCO-docketed filing; copy hosted by Ohio Capital Journal) · retrieved 2026-10-20 |
| Note 13 |
Joint Stipulation term, not in the Schedule DCT sheets: a customer wishing to reduce its Contract Capacity may request that AEP Ohio assign up to 25% of its Contract Capacity (Reallocated Capacity) to another Schedule DCT customer in lieu of some or all of the associated exit fee, subject to listed conditions (receiving customer signs a DCT ESA, electrical feasibility, receiving customer pays transfer costs and meets collateral, no stranded investment recovered from other ratepayers, written attestations). “25% of its Contract Capacity (“Reallocated Capacity”) to another Schedule DCT” Joint Stipulation and Recommendation (Oct. 23, 2024), §III.G Assigning Retail Capacity to Another Customer, pp. 10-12. Whether the Commission's July 9, 2025 order adopted §III.G unmodified could not be checked: the order text was not retrievable. · Joint Stipulation and Recommendation, PUCO Case No. 24-508-EL-ATA (Oct. 23, 2024), as filed as Exhibit JP-1S in Utah PSC Docket 24-035-04 · retrieved 2026-10-20 |
Documents read
- Ohio Power Company P.U.C.O. No. 22 tariff book (October 2026), incl. Schedule DCT Sheets 223-1 to 223-8 tariff · filed August 28, 2026 · retrieved 2026-10-20
- Ohio Power Company compliance tariffs (Schedule DCT, P.U.C.O. No. 21) in response to the July 9, 2025 Opinion and Order, Case No. 24-508-EL-ATA (PUCO-docketed filing; copy hosted by Ohio Capital Journal) tariff · filed July 11, 2025 · retrieved 2026-10-20
- Joint Stipulation and Recommendation, PUCO Case No. 24-508-EL-ATA (Oct. 23, 2024), as filed as Exhibit JP-1S in Utah PSC Docket 24-035-04 stipulation · filed October 23, 2024 · retrieved 2026-10-20
- PUCO Commission meeting minutes, July 9, 2025 other · filed July 9, 2025 · retrieved 2026-10-20
- PUCO Commission meeting minutes, August 5, 2026 other · filed August 5, 2026 · retrieved 2026-10-20
PPL Electric Utilities Corporation
Pennsylvania Public Utility Commission · docket R-2025-3057164 · EIA utility ID 14715
| Tariff as filed |
Rate Schedule LP-6 – Large Load Interconnections (Electric Pa. P.U.C. No. 202, Supplement No. 2) “LP-6 – Large Load Interconnections” Table of Contents p. 3; schedule at Pages 35C-35F · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
|---|---|
| Status |
effective since July 1, 2026 “approved by the Pennsylvania Public Utility Commission in its Opinion and Order entered June 11, 2026, at Docket” Page 2 (List of Changes) recites the Commission Opinion and Order entered June 11, 2026; every page footer reads "Effective: July 1, 2026". Status is taken from PPL's filed compliance tariff: the order itself is on puc.pa.gov, which refused connections from this host on 2026-10-20. · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Filed | Not found in the cited documents The base rate case filing date is not stated in the archived compliance tariff, and the PA PUC order could not be retrieved (puc.pa.gov refused connections on 2026-10-20). The compliance supplement issue date (June 30, 2026) is in notes. |
| Effective |
2026-07-01 “Effective: July 1, 2026” Footer of Pages 35C-35F (and every page of the supplement) · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Applies to |
Large general service from lines of 69 kV or higher to large load (data center) customers that started service on or after October 1, 2025, with peak demand of 50 MW or more at a single facility, or at least 75 MW in aggregate among facilities taking service at or above 69 kV within a 10-mile radius. PPL may petition to classify a 50-75 MW single facility under LP-5 if it causes no transmission network upgrade costs. “and have a peak electric demand of 50 MW or greater at a single facility or at least equal to 75” Page 35C, Application · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Minimum term |
Electric Service Agreement initial term of not less than ten years. “(1) The ESA will contain an initial term of not less than ten (10) years;” Page 35D, Electric Service Agreement item (1) · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Minimum billing |
Until the Rate Base Security Obligation is satisfied: greater of actual peak demand or 80% of the load in the load ramp schedule. After it is satisfied: 80% for the first five years of the initial term and 50% for the second five years. Voluntary interruptible option reduces the minimum load guarantee to 60% (first five years) and 30% (second five years). “demand values, or 80% of the load provided in the load ramp schedule;” Page 35E, items (7)-(8) and Voluntary Interruptible Option · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Ramp schedule |
Customer provides an initial load ramp schedule for up to the first five years of the initial term (the tariff says this does not prohibit a ramp schedule that does not exceed the initial term). “(2) The ESA will require the customer to provide an initial load ramp schedule for up” Page 35D, item (2) · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Collateral / security |
Security equal to the cost of upgrades needed to serve the customer that are placed in rate base and recovered through transmission rates (the 'Rate Base Security Obligation'), as a letter of credit, parent guarantee, or other instrument acceptable to the Company; satisfied once transmission revenue from the customer equals that obligation. Separately, CIAC milestone payments are required for directly assignable T&D upgrades (item 10). “(3) The ESA will require the LP-6 customer to provide security in an amount equal” Page 35D, items (3)-(6); Page 35E, item (10) · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Exit terms |
Exit fee equal to the greater of the remaining minimum load guarantee obligation for the ESA term at termination or the remaining Rate Base Security Obligation. It is applied first to reduce transmission rate base, with the remainder credited to the FERC Transmission Formula Rate revenue requirement. “(9) The ESA will contain an exit fee that is equal to the remaining minimum load” Page 35E, item (9) and following paragraph · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Capacity reductions | Not found in the cited documents Rate Schedule LP-6 (Pages 35C-35F) contains no allowance to reduce contracted load; the minimum load guarantee steps down from 80% to 50% after five years (see Minimum billing), which is a billing term, not a reduction allowance. |
| Assignment | Not found in the cited documents Rate Schedule LP-6 (Pages 35C-35F) contains no provision on assignment or transfer of the ESA; searched the full supplement for 'assign' and found no LP-6 hit. |
| Note 1 |
From January 1, 2027, PPL will allocate $11 million of Universal Service Rider costs annually to the LP-6 class, recovered through a non-bypassable customer charge. “Beginning January 1, 2027, PPL Electric will allocate $11 million of USR costs annually to” Universal Service Rider page; also Page 35C · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Note 2 |
LP-6 distribution charge is a $999.11 monthly customer charge, which is also the monthly minimum distribution charge; transmission and generation supply are billed under TSC and GSC-2. “$999.11 per month (Customer Charge)” Page 35C, Net Monthly Rate · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Note 3 |
Voluntary interruptible service option lowers the minimum load guarantee. “load guarantee in the customer’s ESA would be reduced to 60% for the first five years and 30%” Page 35E, Voluntary Interruptible Option · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Note 4 |
Single facilities of 50-75 MW at 69 kV+ that cause no transmission network upgrade costs may be moved to Rate LP-5 by Commission-approved petition, served on the parties at R-2025-3057164. “Electric may file a petition with the Commission requesting, subject to Commission review and” Page 35C, Application · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
| Note 5 |
Compliance Supplement No. 2 to Electric Pa. P.U.C. No. 202, which contains LP-6, was issued June 30, 2026. “ISSUED: June 30, 2026” Cover page. This is the issue date of compliance Supplement No. 2 (the version that contains LP-6). The archived file is PPL's corrected-pages version (filename dated 8/27/26), which keeps the June 30 issue date. The base rate case filing date is not stated in the archived document. · PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted · retrieved 2026-10-20 |
Documents read
- PPL Electric Supplement No. 2 to Electric Pa. P.U.C. No. 202, corrected retail tariff pages (clean), utility-hosted tariff · filed June 30, 2026 · retrieved 2026-10-20
Virginia Electric and Power Company (Dominion Energy Virginia)
State Corporation Commission · docket PUR-2025-00058 · EIA utility ID 19876
| Tariff as filed |
Rate Schedule GS-5 “RATE SCHEDULE GS-5” Final Order p. 23, heading "Rate Schedule GS-5" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
|---|---|
| Status |
approved since November 25, 2025 “The Company shall implement a new rate schedule, Rate Schedule GS-5, as set forth” Final Order p. 23 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Filed | Not found in the cited documents The Final Order does not state the filing date of the biennial review application (its only "filed Mar. 31, 2025" citation, p. 1 n.1, is the parallel fuel-factor case PUR-2025-00059). The application itself was not located/archived; no GS-5 compliance tariff has been filed or posted as of 2026-10-20. |
| Effective | Not found in the cited documents Not yet effective. The Final Order (p. 23) directs GS-5 to be implemented effective January 1, 2027 (see notes); no compliance Schedule GS-5 is in Dominion's posted Virginia tariff book as of 2026-10-20 (business-rates page lists GS-1 through GS-4 only). |
| Applies to |
Customers with (1) a measured or contracted demand of 25 MW or greater on a contiguous site and (2) a measured or expected load factor of at least 75% “25 megawatts (“MW”) or greater on a contiguous site” Final Order p. 23, "GS-5 Rate Class" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Minimum term |
14-year contract term, for customers taking initial service and signing an ESA on or after January 1, 2027 “The contract term shall be 14 years.” Final Order p. 24, "Contract" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Minimum billing |
Minimum demand charges: distribution 85% of contracted demand; transmission 85% of contracted demand; generation 60% of contracted demand (PJM capacity expense excluded from the generation minimum) “(1) minimum distribution charge of 85% contracted demand; (2) minimum transmission charge” Final Order p. 25, "Minimum Demand Charges" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Ramp schedule |
Load ramp period within the contract term not to exceed four years, with a minimum annual ramp of 20% “include, within the contract term, a load ramp period not to exceed four years (with a minimum” Final Order p. 24, "Contract" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Collateral / security |
$1.5 million/MW; reduction up to 70% based on established credit; third-party guarantees and letters of credit allowed; 1/14th of the requirement released each year of the contract term; cash collateral accrues interest. Applies to customers taking initial service and signing an ESA on or after January 1, 2027. “collateral requirement terms, including: (1) $1.5 million/MW; (2) a reduction up to 70% based” Final Order p. 25, "Collateral Requirements" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Exit terms |
A customer that ceases operations or defaults during the contract term pays an exit fee covering outstanding minimum charges over the remaining contract duration, subject to capacity reassignment “required to pay an exit fee covering any outstanding minimum charges over the remaining” Final Order p. 24, "Contract" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Capacity reductions |
During the contract term a GS-5 customer may reduce contracted capacity by up to 20% at no cost, and by an additional 30% if another customer agrees to assume the associated capacity; each reduction requires a separate 36-month notice “contract term: (1) by up to 20% at no cost; and (2) by an additional 30% if another customer” Final Order p. 27, "Capacity Reductions" · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Assignment | Not found in the cited documents The Final Order (pp. 23-28, GS-5 provisions) contains no provision on assigning or transferring the electric service agreement itself. Its capacity-reduction terms, which let another customer assume reduced capacity, are recorded under Capacity reductions. |
| Note 1 |
Order sets the GS-5 effective date as January 1, 2027 (prospective; not yet reached on retrieval date) “below, effective January 1, 2027. The Commission finds such to be just and reasonable,” Final Order p. 23 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 2 |
Compliance tariff for changes effective January 1, 2027 must be filed with the Clerk at least 45 days before that date; not yet in the posted tariff book on 2026-10-20 “Accounting and Finance, at least forty-five (45) days in advance of such effective date, as” Final Order p. 28, ordering paragraph (4) · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 3 |
Second eligibility criterion: measured or expected load factor of at least 75% “factor of at least 75%.” Final Order p. 23 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 4 |
Generation minimum demand charge is 60% of contracted demand “of 85% contracted demand; and (3) minimum generation charge of 60% contracted demand.” Final Order p. 25 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 5 |
PJM capacity expense excluded from the minimum generation demand charge “The Commission also approves the Company’s proposal to exclude PJM capacity expense from” Final Order p. 26 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 6 |
Legacy exemptions: no minimum demand charges for customers taking service before January 1, 2016; no minimum generation demand charges for certain CSP / Schedule 10 customers as of January 1, 2025 “from the Company prior to January 1, 2016; and (b) minimum generation demand charges shall” Final Order p. 26 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 7 |
Unless exempt, minimum generation demand charges apply to customers served by a competitive service provider (CSP) “Unless exempted per the above, the minimum generation demand charges shall apply to” Final Order p. 26 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 8 |
Minimum charges continue if the customer keeps taking service after the contract term ends “If the customer continues to take service after the conclusion of the” Final Order p. 24 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 9 |
Contract and collateral provisions apply to customers taking initial service and signing an ESA on or after January 1, 2027 “The contract provisions shall apply to customers taking initial service and signing an” Final Order p. 24 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 10 |
Each capacity reduction requires a separate 36-month notice “Each capacity reduction shall require a separate 36-” Final Order p. 27 · Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) · retrieved 2026-10-20 |
| Note 11 |
Dominion posted Virginia business tariff index lists Schedule GS-4 as its largest general service schedule; no Schedule GS-5 listed as of 2026-10-20 “Schedule GS-4 - Large General Service Primary Voltage” Business rates page, "Rates" list · Dominion Energy Virginia business rates and tariffs index (retrieved to check for a posted Schedule GS-5) · retrieved 2026-10-20 |
Documents read
- Final Order, Case No. PUR-2025-00058 (Doc. Con. Cen. No. 251140150) order · filed November 25, 2025 · retrieved 2026-10-20
- Dominion Energy Virginia business rates and tariffs index (retrieved to check for a posted Schedule GS-5) other · retrieved 2026-10-20
What a record contains
One record per utility per tariff. Every field carries the filing's own words, a page or section reference, a link to the document and the date it was retrieved. A field the documents do not state is shown as not found, with a note on what was checked. Nothing is filled in from press coverage, and no number is computed.
Status comes from the commission's order. A tariff that has been filed and not yet approved is shown as proposed, with its filing date.
What a record does not tell you
What any specific customer has agreed to. Individual service agreements can differ from the tariff they reference, and they are not public.
Whether a site can get service, on what schedule, or at what cost. A tariff sets terms for customers who take service under it; it says nothing about capacity at any location.
Anything about utilities without a record. This is a seed set of tariffs read by hand, not a census. A utility missing from the table may well have a large-load tariff.
How each record is verified
Every cited document is downloaded and its text kept beside its content hash. The export checks each quote against that text and fails if one is missing; it also checks that every document link still resolves, and fails rather than publishing a dead link. Once a week, every cited document is downloaded again and compared byte for byte with the copy the record was read from. A document that has disappeared, or been revised at the same address, flags its record to be read again.
What comes next
These records are not monitored for new filings yet. The weekly check covers only the documents already cited: a new filing in one of these dockets will not appear here until the records are re-read. A docket monitor is the next step, and it will be built against the shape of these records rather than guessed in advance.
Caveats carried with the data
- Each record states what a filed tariff or commission order contains. It does not describe any agreement a specific customer has signed: electric service agreements are bilateral and not public.
- Status comes from the commission's own order or docket, not from press coverage. "Proposed" means filed and not yet approved.
- A field shown as not found means the cited documents were read and did not state it; it does not mean the term does not exist elsewhere (for example in an individual service agreement).
- This is a seed set of hand-verified records, not a census of large-load tariffs. A utility with no record here may still have one.
- Records are not monitored for new filings yet. Each record carries the date its documents were retrieved.
Substation Scout large-load tariff records (state commission filings) · exported 2026-10-22 · 148 quotes checked against the archived documents · every document link resolved on 2026-10-22.