Bonneville Power Administration
A request queue in the Pacific Northwest: named requests with a point of interconnection, compared week to week
290 load requests not withdrawn 50.7 GW requested, as filed- Requests on record
- 464
- Changes logged
- 47 since 2026-09-23
- Source last updated
- 2026-11-23
Georgia Power
A quarterly report to the Georgia PSC: anonymized project rows with no location, and Georgia Power's own list of what changed
118 projects in Q2 2026 80.1 GW announced load, as filed- Request or Contract for Electric Service
- 32 · 15.6 GW
- Quarters on file
- 10 since Q1 2024
- Quarters checked, adding up
- 8
- Data as of
- 2026-06-30
Latest changes
The largest recent moves from each source, alternating. BPA rows come from comparing one week's file with the last; Georgia Power rows are Georgia Power's own lists for Q2 2026. Megawatts are the change, signed, not the new total.
| Source | Change | MW | Detail |
|---|---|---|---|
| BPA 2026-11-23 · weekly comparison |
New request | +277 | Energizer 277 MW Alternative Interconnection Klickitat County |
| Georgia Power 2026-06-30 · Q2 2026 report |
Added | +1,500 | Entered the pipeline June 11, 2026 |
| BPA 2026-11-09 · weekly comparison |
Restated upward | +500 | Lake Placid Phase 3 Adams County · RECEIVED → RECEIVED |
| Georgia Power 2026-06-30 · Q2 2026 report |
Added | +900 | Entered the pipeline June 30, 2026 |
| BPA 2026-11-09 · weekly comparison |
Withdrawn | −400 | Lake Placid Phase 2 Adams County · RECEIVED → WITHDRAWN |
| Georgia Power 2026-06-30 · Q2 2026 report |
Added | +880 | Entered the pipeline June 17, 2026 |
| BPA 2026-11-09 · weekly comparison |
Withdrawn | −100 | Lake Placid Phase 1 Adams County · RECEIVED → WITHDRAWN |
| Georgia Power 2026-06-30 · Q2 2026 report |
Restated load | +755 | 481 → 1,236 MW |
| BPA 2026-11-02 · weekly comparison |
Withdrawn | −7 | Bellevue Substation Franklin County, WA · STUDY COMPLETED → WITHDRAWN |
| Georgia Power 2026-06-30 · Q2 2026 report |
Added | +750 | Entered the pipeline May 1, 2026 |
A withdrawal or a removal from the report is not evidence that power can be connected anywhere. A project Georgia Power removes may still be active; the reason is Georgia Power's.
Why this exists
The interconnection queue everyone tracks is a generation queue. It answers "who wants to put power onto the grid here." That is a well-covered question.
The question a data center, fab or electrolyser developer actually has is the opposite one: who else is asking to take power off the grid here. Large-load requests compete for the same finite substation capacity, the same transformer headroom and the same study engineers as generation does — but they are published separately, sporadically, and in far fewer places.
Where a transmission provider does publish them, they are a leading indicator of exactly where large-load attention is concentrating. That is worth having as a record rather than a rumor.
What this covers today
Two sources: Bonneville Power Administration and Georgia Power.
Until October 2026 this page said "Bonneville Power Administration only", and the roadmap said almost nobody else publishes large-load requests as data. Georgia Power does. Every quarter since early 2024 it has filed a spreadsheet with the Georgia Public Service Commission listing each large-load project in its pipeline, with Georgia Power's own list of what changed. It was in a docket this site was already reading for the tariff records.
How the two sources differ
BPA publishes a request queue: one named row per request, with a point of interconnection and a status, in a workbook it refreshes continuously. This site compares each week's file with the last and records what moved.
Georgia Power publishes a quarterly report: one row per project, with the name and location redacted, and its own list of what changed since the previous quarter. Rows cannot be followed from one quarter to the next, so its lists are reproduced as filed instead.
The two are not added together here. A BPA figure is the megawatts a requester filed with a transmission provider. A Georgia Power figure is the load Georgia Power reports for a project in its economic development pipeline, as of 2037. Each source's figures are shown on its own terms.
What this does not cover
Most utilities and transmission providers publish neither kind of list in a form a program can read. A large load served by a utility that does not publish its requests does not appear here at all, and that is most of the country.
So the absence of a request in an area is not evidence that no large load is proposed there. It frequently means nobody published it.
What comes next
More regions, in the order that publication quality allows rather than the order that would be most useful. Candidates being assessed are PJM's large-load process, the ERCOT large-load interconnection queue, and the Western utilities that currently publish only PDFs. See the roadmap for how this sits alongside regulatory tracking.