Why this exists

The interconnection queue everyone tracks is a generation queue. It answers "who wants to put power onto the grid here." That is a well-covered question.

The question a data center, fab or electrolyser developer actually has is the opposite one: who else is asking to take power off the grid here. Large-load requests compete for the same finite substation capacity, the same transformer headroom and the same study engineers as generation does — but they are published separately, sporadically, and in far fewer places.

Where a transmission provider does publish them, they are a leading indicator of exactly where large-load attention is concentrating. That is worth having as a record rather than a rumour.

291live load requests
50.5 GWrequested, as filed
461requests on record
2026-10-12source last updated

What this covers today

Bonneville Power Administration only.

BPA is the federal transmission provider for the Pacific Northwest and is not an RTO. Its published interconnection queue contains two distinct request types, and this page reads only the second one: requests to interconnect load to the Federal Columbia River Transmission System. The generation half of the same file feeds the Queue Wire.

BPA was first for a practical reason: it publishes both halves in one machine-readable spreadsheet, refreshed continuously, with a point of interconnection named on almost every row. Most transmission providers publish neither half in a form a program can read.

What this does not cover

A large load served by a local utility rather than by BPA directly may not appear here at all. Puget Sound Energy, Portland General Electric, PacifiCorp and Avista each run their own interconnection processes, and their queues are published as periodic PDFs or not at all.

So the absence of a request in an area is not evidence that no large load is proposed there. It frequently means nobody published it.

What the data does not say

BPA publishes no end-use field. There is no column that says "data center", "fab" or "greenhouse" — a row tells you how many megawatts are requested at which substation, and what stage the request has reached.

What BPA does publish is a project name, on every load request. Some of those names are self-describing — "West Hillsboro Data Center Project (Phase 1)", "NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2)", "Thompson Creek Mine Load" — and some are not: "Open Range", "SSP-Sunset", "Energizer II". Roughly one live request in ten carries a recognisable end-use hint in its name. The rest could be anything.

So the honest position is that end use is sometimes legible from the name and never certified by the data. This site reproduces the name as filed and does not classify it. If you total up the megawatts here and call the result "data center demand", that is your inference, not a figure BPA published.

Requested megawatts are as filed by the requester, not a study result — a filed number is an ask, not an entitlement. Points of interconnection are BPA's own free text and sometimes name a transmission line rather than a substation.

What comes next

More regions, in the order that publication quality allows rather than the order that would be most useful. Candidates being assessed are PJM's large-load process, the ERCOT large-load interconnection queue, and the Western utilities that currently publish only PDFs. See the roadmap for how this sits alongside regulatory tracking.

Live load requests

The 50 largest live requests by megawatts as filed. Withdrawn, terminated and decommissioned requests are on record but excluded here. A filed megawatt figure is what the requester asked for, not a study result and not an entitlement.

MW as filedProject name as filedLocation Point of interconnectionStatusRequest
3,300 Open Range Adams County Lower Monumental-Hanford No 1 Lower Monumental-Ashe No 1 Grand Coulee-Hanford No 1 RECEIVED L0705
2,750 DOE Data Center Benton County, WA Ashe Substation STUDY L0673
2,225 Longhorn-McNary 230 kV Loop Morrow County, OR Longhorn Substation, McNary Substation STUDY L0653
1,800 NW Hillsboro-North Plains Semiconductor Plants Project (Phase 2) Washington County, OR Allston-Keeler No. 1 STUDY L0561
1,450 McNary 230 kV Substation Umatilla County, OR McNary Substation STUDY L0585
1,400 West Hillsboro Data Center Project (Phase 1) Washington County, OR Keeler-Forest Grove No. 1 & No. 2 Lines STUDY L0560
1,260 Lakeside Industries Klickitat County, WA Big Eddy Substation RECEIVED L0690
1,256 McNary 230 kV Looped Umatilla County McNary Substation STUDY L0636
1,200 1200 MW Data Center Loads Walla Walla County Between #37/1 & 32/1 on the Lower Monumental-McNary line STUDY L0649
1,200 Second 1200 MW Data Center Load Walla Walla County Lower Monumental-McNary No. 1 line RECEIVED L0682
1,200 SSP-Sunset Yakima County Wautoma-Rock Creek No. 1 line or Spring Creek-Wine Country No. 1 line STUDY L0684
1,000 Keeler Substation Washington County, OR BPA's Keeler Substation CONST AGRMT EXE L0452
1,000 Six Mile Canyon Substation Umatilla County, OR BPA's Ashe - Slatt No.1 line CONST AGRMT EXE L0510
1,000 Dallesport Server Farm Klickitat County, WA Big Eddy Substation or Big Eddy-Chenowith No. 2 line STUDY L0664
1,000 Two Rivers 230 kV Umatilla County McNary Substation STUDY L0660
1,000 Energizer II Klickitat County Rock Creek Substation at RECEIVED L0702
1,000 Vines Rest 1000 MW Klickitat County McNary-John Day No. 1 line McNary-John Day No. 2 line RECEIVED L0704
1,000 Lake Placid Phase 3 Adams County Lower Monumental-Hanford No 1 line, Lower Monumental-Ashe No 1 line RECEIVED L0712
970 Yellow Rosebush Wasco County Buckley Substation or Buckley-Marion No. 1 line or Ashe-Marion No. 2 line. STUDY L0699
958 Stack IPI Data Center Klickitat County, WA RKCR-JDAY-1 or MCNY-ROSS-2 near Harvalum Substation STUDY L0545
950 Plymouth 950 MW Benton County, WA McNary-John Day No. 2 line or McNary-Ross No. 1 line or McNary-Horse Heaven No. 1 RECEIVED L0703
912 West Richland Data Center Campus Benton County, WA Ashe-Slatt No 1 line; Ashe-Marion No 2 line STUDY L0621
800 Wind River - Plymouth 230 kV Benton County McNary-John Day No. 2 line STUDY L0685
750 Longhorn 230 kV Substation Morrow County, OR Longhorn Substation STUDY L0586
700 Woodburn 700 MW Marion County Big Eddy-Chemawa No 1 line STUDY L0659
600 Steelhead 230 kV Morrow County, OR Sixmile Canyon Substation at STUDY L0661
550 Juan de Fuca HVDC (Port Angeles) Clallam County, WA Port Angeles STUDY COMPLETED L0201
550 Juan de Fuca HVDC (Fairmount) Jefferson County, WA Fairmount STUDY COMPLETED L0202
500 Morrow Flat_Longhorn Umatilla County, OR Morrow Flat Substation ENERGIZED L0482
500 Starbuck 500 MW Columbia County, WA Central Ferry-Lower Monumental No. 1 line STUDY L0674
484 Project Pivot and Specialized Umatilla County, OR McNary Substation STUDY L0499
450 Industrial Load Morrow County, OR Mcnary Substation or Morrow Flat Substation ENERGIZED L0389
450 McNary 230kV Umatilla County, OR McNary , Bay 28 CONST AGRMT EXE L0481
400 Lake Placid Phase 2 Adams County Saddle Mountain-Walla Walla Avista RECEIVED L0711
370 Boundary Substation Pend Oreille County, WA Boundary Substation STUDY L0417
350 Atlas Agro Benton County, WA Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line STUDY COMPLETED L0534
300 Network Load Expansion 3 Wasco County, OR Chenoweth Substation ENERGIZED L0380
300 Network Load Expansion 4 Quenett Creek Substation Wasco County, OR Quenett Creek Substation ENERGIZED L0433
300 Bonanza Crook County, OR Ponderosa Substation STUDY L0543
300 Stearns Lane Douglas County, OR BPA's Green Valley Substation STUDY L0558
300 Ponderary Renewable Fiber and Blockchain Project Pend Oreille County, WA Usk Substation ENERGIZED L0494
300 Getchell Substation Snohomish County, WA Snohomish-Murray line STUDY L0603
300 Data Storage Facility Walla Walla County, WA Lower Monumental-McNary No. 1 line STUDY L0630
300 Atlas Agro Data Server Facility Benton County, WA Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line STUDY L0647
300 Atlas Agro Data Server Facility, Phase 2 Benton County, WA Benton-White Bluffs No 1 line or White Bluffs-Richland No 1 line STUDY L0657
300 300 MW Data Center Load Served from Grizzly Jefferson County Grizzly Substation STUDY L0650
300 PARS - MW&L Yamhill County TBD RECEIVED L0700
300 Clenera 300 MW Klickitat County Energizer Substation or Rock Creek Substation RECEIVED L0709
250 PW1 & PW2 PARS Columbia County, WA Allston Substation STUDY L0610
250 ATP TES Data Server Benton County Benton Substation RECEIVED L0668

What changed

23 tracked changes since September 23, 2026, excluding the 138 baseline rows. A request restating its megawatts upward without changing status is the strongest signal in this data, and it is invisible in a status-only view — so restatements are tracked separately.

ChangeMWProject name as filed LocationStatusRequest
New request +1,000 Lake Placid Phase 3 Adams County RECEIVED L0712
New request +400 Lake Placid Phase 2 Adams County RECEIVED L0711
New request +100 Lake Placid Phase 1 Adams County RECEIVED L0710
Status change — BBEC - Camp Sub Franklin County, WA STUDY → STUDY COMPLETED L0509
Status change — L0503 Toledo-Wendson 230 kV Lincoln County, OR STUDY → STUDY COMPLETED L0503
Status change — Lyons Loop Marion County, OR STUDY → BPA COMPLETED L0475
Status change — Duckabush Mason County, WA STUDY → BPA COMPLETED L0464
Status change — T3ba'das Substation Mason County, WA STUDY → BPA COMPLETED L0466
Status change — Alderwood Tap Line Lane County, OR STUDY → STUDY COMPLETED L0461
Status change — Briones Crook County, OR STUDY → STUDY COMPLETED L0448
Status change — Salzer Valley Substation Lewis County, WA STUDY → ENERGIZED L0394
Status change — Finley Butte Substation Deschutes County, OR STUDY → STUDY COMPLETED L0393
Status change — Grandview Substation Yakima County, WA STUDY COMPLETED → BPA COMPLETED L0376
Withdrawn -680 PARS - Clatskanie Columbia County RECEIVED → WITHDRAWN L0701
New request +300 Clenera 300 MW Klickitat County RECEIVED L0709
Withdrawn -3 SDC Cowlitz County BPA COMPLETED → WITHDRAWN L0646
Status change — Sunheaven 3 Substation Benton County, WA STUDY → BPA COMPLETED L0613
Status change — Mapleton Lane County, OR STUDY → STUDY COMPLETED L0590
Status change — Boyer Ring Bus Washington County, OR STUDY → STUDY COMPLETED L0570
Status change — AC Management Cowlitz County, WA STUDY → BPA COMPLETED L0565
Status change — Trammel Crow Mid I-5 Cowlitz County, WA STUDY COMPLETED → BPA COMPLETED L0556
Status change — TC Energy 230 kV Intertie at Diamond Lake Junction Klamath County, OR STUDY → STUDY COMPLETED L0513
Status change — Neskowin Substation Polk County, OR STUDY → STUDY COMPLETED L0362

A request moving to a terminal status means the request was withdrawn from the study queue. It is not evidence that power is obtainable at that location — that turns on study results and upgrade obligations this data does not report.

Source

BPA interconnection queue — LINE/LOAD (large load) requests — published spreadsheet. Ingested October 12, 2026.

More

Queue Wire — generation queue deltas → · Roadmap →