| Substation | Described as | kV as printed | Projects | Mentions | Last mentioned |
|---|---|---|---|---|---|
| Brunot Island | Existing | 138 kV, 138kV, 345 kV | 6 | 13 | 2026-10-06 |
| Carson Substation | Existing | 138 kV, 345 kV | 2 | 7 | 2026-10-06 |
| Cheswick | Existing | 138 kV | 1 | 3 | 2026-10-06 |
| Dravosburg Substation | Existing | 138kV, 69 kV | 2 | 6 | 2025-10-08 |
| Findlay Substation | Existing | 138kV | 1 | 4 | 2025-10-08 |
| Forbes | Existing | 138 kV | 1 | 2 | 2024-10-08 |
| Huntingdon | Existing | 138 kV | 1 | 3 | 2026-10-06 |
| McGinley Substation | New | 138 kV | 1 | 3 | 2026-10-06 |
| Neville Substation | Existing | 138kV | 2 | 4 | 2025-10-08 |
| Springdale | Not stated | 138 kV | 1 | 3 | 2026-10-06 |
| Veterans Bridge Substation | New | 138/23 kV | 1 | 2 | 2024-10-08 |
| Yukon | Not stated | 138 kV | 1 | 3 | 2026-10-06 |
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.