Tidd-Wylie Ridge substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AA2-121 | ESC Brooke County Power I | 345 | 685 | Gas | Withdrawn |
| AC1-003 | ESC Brooke County Power I | 345 | 80 | Gas | Withdrawn |
| AB2-104 | ESC Brooke County Power I, LLC | 345 | 65 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.