Tidd-Wylie Ridge substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AA2-121 ESC Brooke County Power I 345 685 Gas Withdrawn
AC1-003 ESC Brooke County Power I 345 80 Gas Withdrawn
AB2-104 ESC Brooke County Power I, LLC 345 65 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.