Substation Scout

Brooke, WV interconnection queue

1 active project totalling 1,000 MW in the PJM queue, plus 7 with terminal status (shown greyed).

1active projects
1,000active MW
8total filed
Queue IDProjectkVMWResourceStatus
C01-1168 Collier - Tidd 345 kV 345 1,000 Gas Active
AA2-121 ESC Brooke County Power I 345 685 Gas Withdrawn
AC1-003 ESC Brooke County Power I 345 80 Gas Withdrawn
AB2-104 ESC Brooke County Power I, LLC 345 65 Gas Withdrawn
AH1-011 Fulton - Tidd 69 kV 69 12 Solar Withdrawn
AH1-118 Windsor 25 kV 25 12 Solar Withdrawn
U2-025 Brooke County Landfill n/r 4 Gas Withdrawn
AF1-065 Tidd-Wylie Ridge 345 kV III 345 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.