City of Suffolk, VA interconnection queue

3 active projects totalling 31.5 MW in the PJM queue, plus 25 with terminal status (shown greyed).

3active projects
31.5active MW
28total filed
Queue IDProjectkVMWResourceStatus
AH1-613 Earleys- Suffolk 230kV 230 130 Hybrid Withdrawn
AH1-503 Kings Fork – Chuckatuck 230 kV 230 127.5 Battery Withdrawn
AH1-323 Elmont 230 kV 230 100 Battery Withdrawn
AH1-730 Not reported n/r 100 Battery Withdrawn
AI1-089 Myrtle - Oak Ridge 115 kV 115 100 Battery Withdrawn
AI1-102 Suffolk 115 kV 115 100 Battery Withdrawn
AG1-027 Suffolk-Holland 115 kV 115 82.1 Solar Withdrawn
AG2-312 Suffolk - Sunbury 230 kV 230 75 Solar Withdrawn
AH2-107 Suffolk 115 kV 115 69 Battery Withdrawn
AG1-518 Suffolk 230 kV 230 50 Hybrid Withdrawn
AH1-264 Suffolk- Sunbury 230kV 230 50 Battery Withdrawn
AH2-142 Not reported n/r 50 Battery Withdrawn
AH2-143 Not reported n/r 50 Battery Withdrawn
AG2-543 Suffolk - Earleys 230 kV 230 42 Hybrid Withdrawn
AF2-076 Suffolk-Nucor Steel 230 kV 230 30 Solar Withdrawn
U2-031 Kings Fork 34.5kV 34.5 24.8 Gas Withdrawn
X1-053 Suffolk 34.5kV 34.5 20 Gas Withdrawn
AE2-225 Hosier Road Solar 34 12 Solar Withdrawn
AF2-043 Pleasant Hill Solar 34.5 12 Solar In Service
AD2-215 Godwin Blvd Solar 34.5 9.8 Solar Withdrawn
AF1-032 Stratford Solar Center 34.5 9.8 Solar In Service
AC1-045 TWE Myrtle Solar 34.5 9.7 Solar Withdrawn
AD1-144 TWE Myrtle Solar Project 34.5 9.7 Solar In Service
AE2-229 Hosier Road Solar II 34 9 Solar Withdrawn
Y2-066 Suffolk Landfill Units 1-10 34.5 9 Gas Withdrawn
AF1-016 Suffolk 115 kV 115 7.7 Solar Withdrawn
AA2-040 Kings Fork 34.5kV 34.5 0 Other Withdrawn
AG1-028 Suffolk-Holland 115 kV 115 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.