Suffolk - Sunbury substation interconnection queue
2 active projects totaling 165 MW in the PJM queue, plus 1 with terminal status (shown grayed).
Target commercial operation dates as filed run from Dec 2025 to Sep 2031 (3 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
2active projects
165active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2016 | Suffolk - Sunbury 230 kV | 230 | 120 | Hybrid | Active | Sep 2031 |
| AG2-312 | Suffolk - Sunbury 230 kV | 230 | 75 | Solar | Withdrawn | Dec 2025 |
| C01-1255 | Suffolk - Sunbury 230 kV | 230 | 45 | Solar | Active | Jun 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Suffolk County, VA
- Suffolk - Nucor Tap: 2 active, 541 MW of 4 filed
- Suffolk: 4 active, 120.8 MW of 14 filed
- Copeland DP - Holland: 2 active, 110 MW of 2 filed
Other PJM queue substations in City of Suffolk, VA
- Suffolk: 4 active, 120.8 MW of 14 filed
- Kings Fork: 1 active, 9.7 MW of 4 filed
- Elmont: none active of 3 filed
- Suffolk-Holland: none active of 2 filed
Other PJM queue substations in Gates County, NC
- Suffolk - Nucor Tap: 2 active, 541 MW of 4 filed
- Nucor Steel-Suffolk: none active of 2 filed