Kings Fork substation interconnection queue
1 active project totalling 9.7 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
9.7active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U2-031 | Kings Fork 34.5kV | 34.5 | 24.8 | Gas | Withdrawn |
| AD2-215 | Godwin Blvd Solar | 34.5 | 9.8 | Solar | Withdrawn |
| AD1-144 | TWE Myrtle Solar Project | 34.5 | 9.7 | Solar | In Service |
| AA2-040 | Kings Fork 34.5kV | 34.5 | 0 | Other | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.