Kings Fork substation interconnection queue

1 active project totalling 9.7 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
9.7active MW
4total filed
Queue IDProjectkVMWResourceStatus
U2-031 Kings Fork 34.5kV 34.5 24.8 Gas Withdrawn
AD2-215 Godwin Blvd Solar 34.5 9.8 Solar Withdrawn
AD1-144 TWE Myrtle Solar Project 34.5 9.7 Solar In Service
AA2-040 Kings Fork 34.5kV 34.5 0 Other Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.