Kings Fork substation interconnection queue
1 active project totaling 9.7 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Kings Fork as the point of interconnection, all in City of Suffolk, VA.
Target commercial operation dates as filed run from Jun 2011 to Dec 2021 (4 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| U2-031 | Kings Fork 34.5kV | 34.5 | 24.8 | Gas | Withdrawn | Jun 2011 |
| AD2-215 | Godwin Blvd Solar | 34.5 | 9.8 | Solar | Withdrawn | Dec 2021 |
| AD1-144 | TWE Myrtle Solar Project | 34.5 | 9.7 | Solar | In Service | Jun 2020 |
| AA2-040 | Kings Fork 34.5kV | 34.5 | 0 | Other | Withdrawn | Aug 2015 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Kings Fork” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Kings Fork: Expansion Tracker, PJM planning: DOM state not printed
Other PJM queue substations in City of Suffolk, VA
- Suffolk - Sunbury: 2 active, 165 MW of 3 filed
- Suffolk: 4 active, 120.8 MW of 14 filed
- Elmont: none active of 3 filed
- Suffolk-Holland: none active of 2 filed