Suffolk-Holland substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Suffolk-Holland as the point of interconnection, all in City of Suffolk, VA.
Target commercial operation date as filed: Dec 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-027 | Suffolk-Holland 115 kV | 115 | 82.1 | Solar | Withdrawn | Dec 2024 |
| AG1-028 | Suffolk-Holland 115 kV | 115 | 0 | Battery | Withdrawn | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in City of Suffolk, VA
- Suffolk - Sunbury: 2 active, 165 MW of 3 filed
- Suffolk: 4 active, 120.8 MW of 14 filed
- Kings Fork: 1 active, 9.7 MW of 4 filed
- Elmont: none active of 3 filed