Substation Scout

Pleasant Hill Solar

PJM queue ID AF2-043

Pleasant Hill Solar (AF2-043) is listed in the PJM interconnection queue as a 12 MW solar project in City of Suffolk, VA. The filing names Suffolk as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2022.

Queue IDAF2-043
Project namePleasant Hill Solar
Status (as published)In Service
SubstationSuffolk
Point of interconnectionSuffolk 34.5 kV
CountyCity of Suffolk
StateVA
Voltage34.5 kV
Capacity12 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2022-12-31
Source datasetserial

Same substation and county

Suffolk substation: 14 requests in the PJM queue, 4 active totaling 120.8 MW.

Queue IDProjectMWResourceStatus
C01-1685Suffolk 230 kV74.5BatteryActive
C01-1686Suffolk 230 kV24.5BatteryActive
AF1-032Stratford Solar Center9.8SolarIn Service
AI1-102Suffolk 115 kV100BatteryWithdrawn
AH2-107Suffolk 115 kV69BatteryWithdrawn
AG1-518Suffolk 230 kV50HybridWithdrawn
X1-053Suffolk 34.5kV20GasWithdrawn
AE2-104Switchgrass Solar 118.9SolarWithdrawn
AE2-225Hosier Road Solar12SolarWithdrawn
AE2-229Hosier Road Solar II9SolarWithdrawn
Y2-066Suffolk Landfill Units 1-109GasWithdrawn
AF1-016Suffolk 115 kV7.7SolarWithdrawn

1 more on the substation page.

City of Suffolk, VA: 28 requests in the PJM queue, 3 active totaling 31.5 MW.

A substation with the same name is named in PJM transmission planning materials: Suffolk (DOM, 10 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity12
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first