Suffolk - Nucor Tap substation interconnection queue

2 active projects totaling 541 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2030 to Apr 2031 (4 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (4 filings).

2active projects
541active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1499 Suffolk - Nucor Tap 230 kV 230 375 Hybrid Active Dec 2030
C01-2144 Suffolk - Nucor Tap 230 kV 230 166 Hybrid Active Apr 2031
C01-1405 Suffolk - Nucor Tap 230 kV 230 120 Battery Withdrawn Dec 2030
C01-1303 Suffolk - Nucor Tap 230 kV 230 110.4 Solar Withdrawn Dec 2030

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

2 changes to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-23C01-1405Terminal status120 Active → Withdrawn
2026-09-23C01-1303Terminal status110.4 Active → Withdrawn

Other PJM queue substations in Gates County, NC

All 9 PJM queue filings in Gates County, NC.

Other PJM queue substations in Suffolk County, VA

All 7 PJM queue filings in Suffolk County, VA.