Lightfoot substation interconnection queue
1 active project totaling 12 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Lightfoot as the point of interconnection, all in James City, VA.
Target commercial operation dates as filed run from Oct 2022 to Oct 2023 (2 filings).
1active projects
12active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-032 | Lightfoot 34.5 kV | 34.5 | 12 | Solar | Withdrawn | Oct 2022 |
| AG1-145 | Norge Solar | 34.5 | 12 | Solar | In Service | Oct 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.