Lightfoot substation interconnection queue

1 active project totalling 12 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
12active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-032 Lightfoot 34.5 kV 34.5 12 Solar Withdrawn
AG1-145 Norge Solar 34.5 12 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.