Surry-Skiffes Creek substation interconnection queue
1 active project totaling 650 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Surry-Skiffes Creek as the point of interconnection, all in James City, VA.
Target commercial operation date as filed: Jun 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dominion (2 filings).
1active projects
650active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-716 | Surry-Skiffes Creek 500kV | 500 | 650 | Battery | Active | Jun 2029 |
| AH1-726 | Surry-Skiffes Creek 500kV | 500 | 600 | Battery | Withdrawn | Jun 2029 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in James City, VA
- Light Foot: 1 active, 13.3 MW of 2 filed
- Lightfoot: 1 active, 12 MW of 2 filed
- Lebanon: 1 active, 0 MW of 3 filed