Substation Scout

Surry-Skiffes Creek substation interconnection queue

1 active project totaling 650 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Surry-Skiffes Creek as the point of interconnection, all in James City, VA.

Target commercial operation date as filed: Jun 2029 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dominion (2 filings).

1active projects
650active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH1-716 Surry-Skiffes Creek 500kV 500 650 Battery Active Jun 2029
AH1-726 Surry-Skiffes Creek 500kV 500 600 Battery Withdrawn Jun 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in James City, VA

All 8 PJM queue filings in James City, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first