James City, VA interconnection queue

3 active projects totalling 675.3 MW in the PJM queue, plus 5 with terminal status (shown greyed).

3active projects
675.3active MW
8total filed
Queue IDProjectkVMWResourceStatus
AH1-716 Surry-Skiffes Creek 500kV 500 650 Battery Active
AH1-726 Surry-Skiffes Creek 500kV 500 600 Battery Withdrawn
AG2-322 Skiffs Creek 230 kV 230 150 Battery Withdrawn
C01-1093 Lebanon 34.5 kV 34.5 22.5 Battery Withdrawn
AE1-175 Lightfoot 34.5 kV II 34.5 13.3 Solar In Service
AG1-032 Lightfoot 34.5 kV 34.5 12 Solar Withdrawn
AG1-145 Norge Solar 34.5 12 Solar In Service
AE1-174 Light Foot 34.5 kV 34.5 5 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.