James City, VA interconnection queue
3 active projects totalling 675.3 MW in the PJM queue, plus 5 with terminal status (shown greyed).
3active projects
675.3active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-716 | Surry-Skiffes Creek 500kV | 500 | 650 | Battery | Active |
| AH1-726 | Surry-Skiffes Creek 500kV | 500 | 600 | Battery | Withdrawn |
| AG2-322 | Skiffs Creek 230 kV | 230 | 150 | Battery | Withdrawn |
| C01-1093 | Lebanon 34.5 kV | 34.5 | 22.5 | Battery | Withdrawn |
| AE1-175 | Lightfoot 34.5 kV II | 34.5 | 13.3 | Solar | In Service |
| AG1-032 | Lightfoot 34.5 kV | 34.5 | 12 | Solar | Withdrawn |
| AG1-145 | Norge Solar | 34.5 | 12 | Solar | In Service |
| AE1-174 | Light Foot 34.5 kV | 34.5 | 5 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.