Light Foot substation interconnection queue
1 active project totaling 13.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Light Foot as the point of interconnection, all in James City, VA.
Target commercial operation dates as filed run from Oct 2020 to Nov 2021 (2 filings).
1active projects
13.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-175 | Lightfoot 34.5 kV II | 34.5 | 13.3 | Solar | In Service | Nov 2021 |
| AE1-174 | Light Foot 34.5 kV | 34.5 | 5 | Battery | Withdrawn | Oct 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in James City, VA
- Surry-Skiffes Creek: 1 active, 650 MW of 2 filed
- Lightfoot: 1 active, 12 MW of 2 filed
- Lebanon: 1 active, 0 MW of 3 filed