Light Foot substation interconnection queue

1 active project totaling 13.3 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Light Foot as the point of interconnection, all in James City, VA.

Target commercial operation dates as filed run from Oct 2020 to Nov 2021 (2 filings).

1active projects
13.3active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-175 Lightfoot 34.5 kV II 34.5 13.3 Solar In Service Nov 2021
AE1-174 Light Foot 34.5 kV 34.5 5 Battery Withdrawn Oct 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.