Laurel substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AB2-130 Laurel 69kV 69 32.3 Solar Withdrawn
AD2-088 Laurel 69kV 69 18 Solar Withdrawn
AI1-082 Laurel 25 kV 25 9 Solar Withdrawn
W1-070 Laurel 69kV 69 7.6 Solar Withdrawn
AD2-118 Laurel 12 kV 12 3.3 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.