Laurel substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 5 with terminal status (shown grayed).

Target commercial operation dates as filed run from May 2011 to Dec 2026 (5 filings).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB2-130 Laurel 69kV 69 32.3 Solar Withdrawn Jun 2019
AD2-088 Laurel 69kV 69 18 Solar Withdrawn Dec 2020
AI1-082 Laurel 25 kV 25 9 Solar Withdrawn Dec 2026
W1-070 Laurel 69kV 69 7.6 Solar Withdrawn May 2011
AD2-118 Laurel 12 kV 12 3.3 Solar Withdrawn Apr 2020

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, DE

All 70 PJM queue filings in Sussex County, DE.

Other PJM queue substations in Westmoreland County, PA

All 33 PJM queue filings in Westmoreland County, PA.

Other PJM queue substations in Wicomico County, MD

All 34 PJM queue filings in Wicomico County, MD.