Laurel substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).
0active projects
0active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB2-130 | Laurel 69kV | 69 | 32.3 | Solar | Withdrawn |
| AD2-088 | Laurel 69kV | 69 | 18 | Solar | Withdrawn |
| AI1-082 | Laurel 25 kV | 25 | 9 | Solar | Withdrawn |
| W1-070 | Laurel 69kV | 69 | 7.6 | Solar | Withdrawn |
| AD2-118 | Laurel 12 kV | 12 | 3.3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.