Millsboro II substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Millsboro II as the point of interconnection, all in Sussex County, DE.
Target commercial operation dates as filed run from Jul 2018 to Jan 2019 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-179 | Millsboro 25kV II | 25 | 6 | Other | Withdrawn | Jan 2019 |
| AC2-011 | Millsboro 25kV II | 25 | 6 | Other | Withdrawn | Jul 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Sussex County, DE
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Indian River I: 2 active, 66.3 MW of 4 filed
- Milton: 1 active, 43.5 MW of 4 filed
- Laurel-Sussex: 2 active, 8 MW of 3 filed
- Indian River: 1 active, 5 MW of 10 filed
- Laurel: none active of 5 filed
- Indian River II: none active of 4 filed
- Milford: none active of 4 filed
- Sussex County: none active of 4 filed
- Millsboro: none active of 3 filed
- Nelson-Indian River: none active of 3 filed
- Bethany: none active of 2 filed
- Conaway - North Seaford: none active of 2 filed