Substation Scout

Millsboro II substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Millsboro II as the point of interconnection, all in Sussex County, DE.

Target commercial operation dates as filed run from Jul 2018 to Jan 2019 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-179 Millsboro 25kV II 25 6 Other Withdrawn Jan 2019
AC2-011 Millsboro 25kV II 25 6 Other Withdrawn Jul 2018

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, DE

All 70 PJM queue filings in Sussex County, DE.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first