Sussex County substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
X2-046 Sussex County n/r 7.6 Solar Withdrawn
X3-071 Burbage Property 12 3.8 Solar Withdrawn
X3-077 Baxter Property 12 3.8 Solar Withdrawn
X4-040 Sussex County 12kV 12 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.