Sussex County substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| X2-046 | Sussex County | n/r | 7.6 | Solar | Withdrawn |
| X3-071 | Burbage Property | 12 | 3.8 | Solar | Withdrawn |
| X3-077 | Baxter Property | 12 | 3.8 | Solar | Withdrawn |
| X4-040 | Sussex County 12kV | 12 | 0 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.