Laurel-Sussex substation interconnection queue

2 active projects totalling 8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

2active projects
8active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF1-157 Laurel-Sussex 69 kV 69 15 Solar Withdrawn
T11 Southern LF Units 1-5 69 5 Gas In Service
N17 Southern Landfill Units 1-4 69 3 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.