Laurel-Sussex substation interconnection queue

2 active projects totaling 8 MW in the PJM queue, plus 1 with terminal status (shown grayed).

3 PJM queue filings name Laurel-Sussex as the point of interconnection, all in DE.

Target commercial operation dates as filed run from Oct 2006 to Dec 2022 (3 filings).

2active projects
8active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-157 Laurel-Sussex 69 kV 69 15 Solar Withdrawn Dec 2022
T11 Southern LF Units 1-5 69 5 Gas In Service May 2010
N17 Southern Landfill Units 1-4 69 3 Gas In Service Oct 2006

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, DE

All 70 PJM queue filings in Sussex County, DE.

Other PJM queue substations in New Castle County, DE

All 65 PJM queue filings in New Castle County, DE.