Indian River I substation interconnection queue
2 active projects totaling 66.3 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Indian River I as the point of interconnection, all in Sussex County, DE.
Target commercial operation dates as filed run from Oct 2026 to Dec 2027 (4 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: DPL (2 filings).
2active projects
66.3active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-193 | Indian River 230 kV I | 230 | 119 | Offshore Wind | Withdrawn | Oct 2026 |
| AB1-056 | Maryland Offshore Wind Energy Project (MOWEP) | 230 | 64.4 | Offshore Wind | Suspended | Dec 2027 |
| AH1-634 | Indian River 230kV I | 230 | 17.7 | Wind | Withdrawn | Dec 2027 |
| AF1-007 | Maryland Offshore Wind Energy Project (MOWEP) | 230 | 1.9 | Offshore Wind | Suspended | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Sussex County, DE
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Milton: 1 active, 43.5 MW of 4 filed
- Laurel-Sussex: 2 active, 8 MW of 3 filed
- Indian River: 1 active, 5 MW of 10 filed
- Laurel: none active of 5 filed
- Indian River II: none active of 4 filed
- Milford: none active of 4 filed
- Sussex County: none active of 4 filed
- Millsboro: none active of 3 filed
- Nelson-Indian River: none active of 3 filed
- Bethany: none active of 2 filed
- Conaway - North Seaford: none active of 2 filed
- Millsboro II: none active of 2 filed
Site Scanner