Pemberton substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Mar 2012 to May 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI1-096 | Pemberton 138 kV | 138 | 42 | Hybrid | Withdrawn | May 2027 |
| W3-036 | Pemberton 12kV | 12 | 1.9 | Solar | Withdrawn | Mar 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wicomico County, MD
- Rockawalkin: 2 active, 8.9 MW of 4 filed
- Edgewood: 1 active, 3 MW of 2 filed
- Edgewood III: 1 active, 1.1 MW of 2 filed
- Laurel: none active of 5 filed
- Mt. Hermon: none active of 3 filed
- North Salisbury: none active of 3 filed
- Edgewood I: none active of 2 filed
- Edgewood II: none active of 2 filed
- New Hope: none active of 2 filed
- Piney Grove-New Church: none active of 2 filed
Site Scanner