Indian River II substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
4 PJM queue filings name Indian River II as the point of interconnection, all in Sussex County, DE.
Target commercial operation dates as filed run from Mar 2020 to Dec 2030 (4 filings).
Transmission owner as filed: DPL (3 filings).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG2-348 | Indian River 230 kV II | 230 | 242.3 | Offshore Wind | Withdrawn | Aug 2025 |
| AG2-347 | Indian River 230 kV II | 230 | 121.2 | Wind | Withdrawn | Dec 2030 |
| AF2-194 | Indian River 230 kV II | 230 | 119 | Offshore Wind | Withdrawn | Oct 2026 |
| AB1-057 | Indian River 230kV II | 230 | 65.4 | Offshore Wind | Withdrawn | Mar 2020 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Sussex County, DE
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Indian River I: 2 active, 66.3 MW of 4 filed
- Milton: 1 active, 43.5 MW of 4 filed
- Laurel-Sussex: 2 active, 8 MW of 3 filed
- Indian River: 1 active, 5 MW of 10 filed
- Laurel: none active of 5 filed
- Milford: none active of 4 filed
- Sussex County: none active of 4 filed
- Millsboro: none active of 3 filed
- Nelson-Indian River: none active of 3 filed
- Bethany: none active of 2 filed
- Conaway - North Seaford: none active of 2 filed
- Millsboro II: none active of 2 filed
Site Scanner