Mt. Hermon substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH2-198 Mt. Hermon 69 kV 69 53.8 Solar Withdrawn
AH1-039 Mt. Hermon 23 kV 23 12 Solar Withdrawn
AG2-115 Mt. Hermon 25 kV 25 3.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.