Bethany substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Bethany as the point of interconnection, all in DE.
Target commercial operation dates as filed run from Jun 2018 to Jun 2022 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| R36 | Bluewater Wind - Bethany | 138 | 90 | Offshore Wind | Withdrawn | Jun 2018 |
| AE1-117 | Bethany 138 kV | 138 | 41.5 | Offshore Wind | Withdrawn | Jun 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Sussex County, DE
- Nelson: 7 active, 1,057.4 MW of 14 filed
- Indian River I: 2 active, 66.3 MW of 4 filed
- Milton: 1 active, 43.5 MW of 4 filed
- Laurel-Sussex: 2 active, 8 MW of 3 filed
- Indian River: 1 active, 5 MW of 10 filed
- Laurel: none active of 5 filed
- Indian River II: none active of 4 filed
- Milford: none active of 4 filed
- Sussex County: none active of 4 filed
- Millsboro: none active of 3 filed
- Nelson-Indian River: none active of 3 filed
- Conaway - North Seaford: none active of 2 filed
- Millsboro II: none active of 2 filed