Substation Scout

Bethany substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Bethany as the point of interconnection, all in DE.

Target commercial operation dates as filed run from Jun 2018 to Jun 2022 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
R36 Bluewater Wind - Bethany 138 90 Offshore Wind Withdrawn Jun 2018
AE1-117 Bethany 138 kV 138 41.5 Offshore Wind Withdrawn Jun 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Sussex County, DE

All 70 PJM queue filings in Sussex County, DE.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first