Westmoreland, PA interconnection queue

7 active projects totalling 1,292.3 MW in the PJM queue, plus 26 with terminal status (shown greyed).

7active projects
1,292.3active MW
33total filed
Queue IDProjectkVMWResourceStatus
Y2-080 Rhodes Lane 500kV 500 1,065 Gas Withdrawn
T174 Smithton Generating Station 500 900 Gas In Service
E17_W29 Yukon 500 kV 500 640 Gas Withdrawn
B34 Seward 1 (Hay Road 5,6,7,8) 230 304 Other In Service
AH1-140 Vasco 138 kV 138 115 Hybrid Withdrawn
C11_W11 Hunker 138 kV 138 88 Gas Withdrawn
AE2-137 Allegheny Energy Center LLC 138 87 Gas Withdrawn
AH2-422 Yukon 138 kV 138 83 Battery Withdrawn
AG1-059 Robbins 138 kV 138 60 Solar Withdrawn
AB1-106 Smithton Generating Station 500 40 Gas In Service
C01-1267 Rhodes Lane 500 kV 500 28 Gas Active
AI1-093 Westmoreland 34.5 kV 34.5 24 Battery Withdrawn
AI1-094 Westmoreland 34.5 kV 34.5 24 Battery Withdrawn
AC2-076 Kiski Valley 25 19.9 Gas Withdrawn
Z1-001 Blairsville East-Social Hall 138kV 138 15.7 Not reported Withdrawn
Z2-016 Blairsville-Social Hall 138kV 138 15.7 Not reported Withdrawn
AE2-131 UN-Kylertown n/r 12 Solar Under Construction
L04 Chestnut Ridge 138 kV 138 12 Wind Withdrawn
U1-081 Monongahela Lock & Dam #4 n/r 10 Hydro Withdrawn
I19 Level Green 25kV 25 9.9 Gas Withdrawn
C01-1123 Garvers Ferry Jct - Braeburn Steel 25 kV 25 9.6 Hydro Withdrawn
AH1-076 Loyalhanna - Reed Junction 25 kV 25 9 Solar Withdrawn
AI1-082 Laurel 25 kV 25 9 Solar Withdrawn
AE2-125 Stahlstown-Ligonier 25 kV 25 8.3 Solar In Service
AG2-089 Pelikan-Kennaloyal 25 kV 25 6 Solar Withdrawn
AI1-066 Bear Peak Rostraver 12.47 kV 12.5 4.5 Solar Withdrawn
AI1-067 Bear Peak Rostraver II 12.47 kV 12.5 4.5 Solar Withdrawn
AA1-112 Westmoreland Landfill Project 25 4 Gas Withdrawn
AH2-361 Scottdale - Iron Bridge 13.2 kV 13.2 3.2 Solar Withdrawn
AG1-141 Hempfield CSG 1 12.5 2.8 Solar Withdrawn
AB1-064 Westmoreland Landfill Project 25 2 Gas Withdrawn
AC1-021 Smithton Generation Station 500 0 Gas In Service
V4-014 Greenridge Landfill n/r 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.