Substation Scout

Nelson-Indian River substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-586 Nelson-Indian River 138kV 138 45 Battery Withdrawn
AH1-584 Nelson-Indian River 138kV 138 30 Solar Withdrawn
AH1-585 Nelson-Indian River 138kV 138 30 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.