Edgewood substation interconnection queue

1 active project totalling 3 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-057 Edgewood 12.47 kV 12.5 3 Solar Active
AB2-166 Aydelotte Solar Project 12 2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.