Westmoreland substation interconnection queue

1 active project totalling 13.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
13.2active MW
5total filed
Queue IDProjectkVMWResourceStatus
AI1-093 Westmoreland 34.5 kV 34.5 24 Battery Withdrawn
AI1-094 Westmoreland 34.5 kV 34.5 24 Battery Withdrawn
AB1-026 Montross Solar 34.5 14 Solar Withdrawn
AC1-118 Montross Solar Facility 34.5 13.2 Solar In Service
AA1-112 Westmoreland Landfill Project 25 4 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.