Millsboro substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AC1-178 Millsboro 25kV 25 6 Other Withdrawn
AC2-010 Millsboro 25kV 25 6 Other Withdrawn
AD1-146 Millsboro 25 kV 25 3.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.