Rockawalkin substation interconnection queue
2 active projects totaling 8.9 MW in the PJM queue, plus 2 with terminal status (shown grayed).
4 PJM queue filings name Rockawalkin as the point of interconnection, all in Wicomico County, MD.
Target commercial operation dates as filed run from Dec 2016 to Feb 2024 (4 filings).
2active projects
8.9active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-180 | Hebron Solar | 69 | 14 | Solar | Withdrawn | Feb 2024 |
| Y3-058 | Rockfish Solar Power Plant | 69 | 5.7 | Solar | In Service | Dec 2016 |
| AI2-207 | Rockawalkin 69 kV | 69 | 5.4 | Solar | Withdrawn | Mar 2023 |
| AF1-258 | Hebron Solar | 69 | 3.2 | Solar | In Service | Sep 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wicomico County, MD
- Edgewood: 1 active, 3 MW of 2 filed
- Edgewood III: 1 active, 1.1 MW of 2 filed
- Laurel: none active of 5 filed
- Mt. Hermon: none active of 3 filed
- North Salisbury: none active of 3 filed
- Edgewood I: none active of 2 filed
- Edgewood II: none active of 2 filed
- New Hope: none active of 2 filed
- Pemberton: none active of 2 filed
- Piney Grove-New Church: none active of 2 filed