Indian River substation interconnection queue
2 active projects totalling 1,455.2 MW in the PJM queue, plus 8 with terminal status (shown greyed).
2active projects
1,455.2active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1130 | Indian River 230 kV | 230 | 1,450.2 | Gas | Active |
| G29 | Indian River 138kV | 138 | 750 | Gas | Withdrawn |
| Q42 | Indian River | n/r | 630 | Coal | Withdrawn |
| AH1-384 | Indian River 230kV | 230 | 380.7 | Offshore Wind | Withdrawn |
| AH1-277 | Indian River 230kV | 230 | 279 | Offshore Wind | Withdrawn |
| AG2-271 | Indian River 230 kV | 230 | 150 | Battery | Withdrawn |
| AH2-077 | Indian River 230 kV | 230 | 150 | Battery | Withdrawn |
| C01-1365 | Indian River 230 kV | 230 | 95.5 | Wind | Withdrawn |
| R72 | Indian River Units 3-4 | 230 | 18 | Coal | Deactivated |
| R73 | Indian River Units #3 & #4 | 138 | 5 | Coal | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.