Piney Grove-New Church substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
Z2-071 Piney Grove-New Church 138kV 138 55 Not reported Withdrawn
AB2-120 Piney Grove-New Church 138kV 138 38 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.